Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
295hours of spills in 2025 between them (typical neighbourhood: about 36)
157spill events counted
Severn Trent Water
John Berrysford Close Csointo Chaddesden Brook53 spills, 134 hours in 2025
1.4 km away
Severn Trent Water
Derby - Eastgate/Pentagon Island (Cso)into River Derwent15 spills, 84 hours in 2025
1.8 km away
Severn Trent Water
Derby - Wayzgoose Drive (Cso)into River Derwent20 spills, 46 hours in 2025
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
Derbion Management Suite - Roof Mounted Solar panelsApproved, not yet built · 310 kW
Mar 2024 3.0 km away
Rooftop solar
Smartparc Food Hub, Evolution Way - Plot 8 Roof Mounted PV Solar PanelsApproved, not yet built
Jun 2024 3.0 km away
Running nearest: Derby Sewage Treatment Works (wind farm, 3.0 km); Sinfin Lane (energy from waste, 5.3 km); Manners Avenue - Solar Panels (rooftop solar, 9.1 km); Crompton Road, Ilkeston - Anaerobic Digestion Plant (anaerobic digestion, 10.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Storage or Distribution of Goods · On land to the south of East Midlands Airport and south-west of M1 Junction 23A
Sept 2026 14.6 km away
Decided
Oaklands Farm Solar ParkGenerating Stations · Land at Rosliston Road, south of Drakelow Power Station
decided Jun 2025 25.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.