Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
459hours of spills in 2025 between them (typical neighbourhood: about 36)
38spill events counted
Severn Trent Water
Barton Under Needwood Stwinto Tributary Of River Trent33 spills, 449 hours in 2025
1.9 km away
Severn Trent Water
Walton Pumping Stationinto River Trent5 spills, 9 hours in 2025
28 planned, approved or being built and 8 running (47 MW between them). Those within 5 km are on the map above.
Battery storage
Drakelow - Battery Energy Storage SystemPlanning application in · 1,000 MW
Dec 2024 250 m away
Battery storage
Fairfields Energy Storage SystemApproved, not yet built · 1,025 MW
Mar 2025 450 m away
Battery storage
Barn Farm - Batter Energy Storage FacilityApproved, not yet built · 200 MW
Jul 2025 450 m away
Battery storage
Barn Farm & Walton Road - Battery StorageApproved, not yet built
Jul 2023 550 m away
Battery storage
Oaklands Solar Farm Project - Solar Farm & Battery StorageApproved, not yet built · 38 MW
Jun 2025 1.6 km away
Rooftop solar
Lanxess, Lichfield Road - Solar PanelsPlanning application in · 210 kW
Feb 2023 1.9 km away
Energy from waste
Drakelow Renewable Energy CentreBeing built · 15 MW
Sept 2019 2.4 km away
Solar farm
Oaklands Solar Farm Project - Solar Farm & Battery StorageApproved, not yet built · 138 MW
Jun 2025 2.8 km away
Battery storage
Caldwell Road - Battery StorageApproved, not yet built · 90 MW
Jul 2024 3.7 km away
Rooftop solar
Port Way, Branston - Solar PanelsApproved, not yet built · 650 kW
Aug 2024 3.7 km away
Rooftop solar
Road and street works within 1 km
2 permitted works running now or planned, 1 of them major.
Major, planned
Rosliston Road, SwadlincoteUtility asset works · CADENT GAS LIMITED · Road closure
Jan 2027 to Jan 2027 200 m away
Minor
Main Street, SwadlincoteUtility asset works · BT · Two-way signals
Nov 2026 to Nov 2026 300 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Decided
Oaklands Farm Solar ParkGenerating Stations · Land at Rosliston Road, south of Drakelow Power Station
decided Jun 2025 1.8 km away
Pre-application
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
Centrum East Retail Park - Solar PanelsApproved, not yet built · 200 kW
Aug 2024 3.9 km away
Battery storage
Breach Farm - Energy BarnApproved, not yet built · 40 MW
Aug 2017 4.7 km away
Running nearest: Drakelow Solar Farm (solar farm, 2.4 km); Blakenhall Park Solar Farm (solar farm, 4.4 km); Land at Coton Park Colliery (solar farm, 5.5 km); Bretby Power (landfill gas, 7.0 km); Rolleston Park Farm (solar farm, 8.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Rail Freight Interchanges · 20km southwest of Nottingham, next to East Midlands Airport
Sept 2026 27.0 km away
Decided
M54 to M6 Link RoadHighways · The scheme is located between M54 Junction 1 and M6 Junction 11 adjacent to the town of Featherstone
decided Apr 2022 29.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.