Country England and Wales › Region East Midlands › Council North West Leicestershire › Neighbourhood Measham & Appleby Magna › Postcode DE12 7DB What's changing near DE12 7DB Within 2 km, around Measham & Appleby Magna in North West Leicestershire. Building, planning, schools, transport, prices and crime.
0 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-1.5% like-for-like prices in Measham & Appleby Magna, 2024 → 2025 (council +1.5%)
-3% recorded crime, last 12 months vs the 12 before
On the map
Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 0 postcodes nearby had new homes completed in the last two years.
2 homes extended 2021–2025, typically adding 58 m²
3 since energy certificates began (2008)
1 in DE12 7DB itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 2 storm overflows within 2 km
1,983 hours of spills in 2025 between them (typical neighbourhood: about 36)
124 spill events counted
Severn Trent Water Snarestone Sewage Treatment Works into River Mease 121 spills, 1,969 hours in 2025
900 m away Severn Trent Water Snarestone Road Pumping Station into Trib Of River Mease 3 spills, 15 hours in 2025
2.0 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 13 planned, approved or being built and 15 running (89 MW between them). Those within 5 km are on the map above.
Wind farm Barns Heath Farm - Wind Turbines Approved, not yet built · 2 MW
Feb 2023 2.3 km away Rooftop solar DSV, Stretton En Le Field - Solar Panels Approved, not yet built · 210 kW
Oct 2024 4.2 km away Rooftop solar Mercia Park, Burton Road - Solar PV Panels Approved, not yet built · 1 MW
Mar 2023 4.5 km away Rooftop solar Mushroom Farm, Lower Fields - Agricultural Building & Solar Panels Approved, not yet built · 580 kW
Jul 2024 5.1 km away Solar farm Manor Park, Twycross - Solar Photovoltaic Panels Approved, not yet built · 180 kW
Sept 2021 5.7 km away Rooftop solar Ceva House, Excelsior Road - Solar Panels Planning application in · 220 kW
Feb 2025 8.0 km away Rooftop solar Clinitron House, Excelsior Road - Solar Panels Approved, not yet built · 160 kW
May 2026 8.1 km away Rooftop solar Motability Operations Limited, Stephenson Court - Solar Panels Approved, not yet built · 280 kW
Apr 2024 8.8 km away Solar farm Stoneshollow Solar Farm Approved, not yet built · 50 MW
Aug 2022 8.9 km away Battery storage Stoneshollow Solar Farm Approved, not yet built
Aug 2022 8.9 km away Battery storage Road and street works within 1 km No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Jun 2025 13.6 km away Decided decided Mar 2025 18.5 km away Recommendation Sept 2026 19.5 km away Decided decided Dec 2014 19.8 km away Pre-application Castle Way Energy Generating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne. application due June 2027 19.9 km away Decided decided Jan 2016 21.8 km away Recommendation Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Packington Solar Farm (solar farm, 3.2 km); Ashby Solar Farm (a) (solar farm, 4.6 km); Lower Fields Mushroom Farm (solar farm, 5.0 km); Hill Farm - Energy Barn (battery storage, 5.6 km); Land at Hill Farm (solar farm, 5.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.