Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
450hours of spills in 2025 between them (typical neighbourhood: about 36)
83spill events counted
Severn Trent Water
Overseal Wastewater Treatment Worksinto Tributary Of River Mease32 spills, 357 hours in 2025
2.0 km away
Severn Trent Water
Linton Southinto Warren Hill Brook17 spills, 47 hours in 2025
31 planned, approved or being built and 13 running (69 MW between them). Those within 5 km are on the map above.
Battery storage
Mount Road, Castle Gresley - Battery Storage FacilityApproved, not yet built · 20 MW
Jul 2022 1.5 km away
Battery storage
Park Road, Overseal - Battery Storage FacilityApproved, not yet built · 50 MW
Jul 2025 1.8 km away
Energy from waste
Keith Willshee Way - Swadlincote Resource Recovery ParkApproved, not yet built · 20 MW
Aug 2025 2.7 km away
Battery storage
Breach Farm - Energy BarnApproved, not yet built · 40 MW
Aug 2017 2.8 km away
Solar farm
Oaklands Solar Farm Project - Solar Farm & Battery StorageApproved, not yet built · 138 MW
Jun 2025 3.6 km away
Battery storage
Caldwell Road - Battery StorageApproved, not yet built · 90 MW
Jul 2024 3.7 km away
Solar farm
Lullington Solar ParkPlanning application in · 44 MW
Jul 2025 3.8 km away
Battery storage
Oaklands Solar Farm Project - Solar Farm & Battery StorageApproved, not yet built · 38 MW
Jun 2025 4.9 km away
Energy from waste
Drakelow Renewable Energy CentreBeing built · 15 MW
Sept 2019 5.6 km away
Battery storage
Fairfields Energy Storage SystemApproved, not yet built · 1,025 MW
Mar 2025 6.2 km away
Battery storage
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Decided
Oaklands Farm Solar ParkGenerating Stations · Land at Rosliston Road, south of Drakelow Power Station
decided Jun 2025 4.8 km away
Pre-application
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
Barn Farm - Batter Energy Storage FacilityApproved, not yet built · 200 MW
Jul 2025 6.2 km away
Rooftop solar
Mercia Park, Burton Road - Solar PV PanelsApproved, not yet built · 1 MW
Mar 2023 6.2 km away
Running nearest: Land at Coton Park Colliery (solar farm, 1.6 km); Shortheath Solar Park (solar farm, 2.9 km); Midland Lead, Kiln Way - Solar Photovoltaic Panels (rooftop solar, 3.9 km); Bretby Power (landfill gas, 4.7 km); Drakelow Solar Farm (solar farm, 5.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Rail Freight Interchanges · 20km southwest of Nottingham, next to East Midlands Airport
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.