Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
25storm overflows within 2 km
373hours of spills in 2025 between them (typical neighbourhood: about 36)
252spill events counted
Severn Trent Water
Kedleston Road Csointo Tributary Of River Derwent46 spills, 146 hours in 2025
1.8 km away
Severn Trent Water
St. Annes Close Csointo Markeaton Brook25 spills, 81 hours in 2025
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
application due June 2027 8.1 km away
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
New-home postcodes with fewer than 5 homes are counted above but not listed. 44 postcodes nearby had new homes completed in the last two years.
Sept 2023 3.0 km away
Rooftop solar
St Christophers Way - Solar PanelsApproved, not yet built · 350 kW
Jul 2022 3.1 km away
Rooftop solar
Wheatcroft Way - Solar PanelsApproved, not yet built · 610 kW
Apr 2022 3.5 km away
Running nearest: Sinfin Lane (energy from waste, 3.2 km); Derby Sewage Treatment Works (wind farm, 5.7 km); Toyota Solar Farm (solar farm, 7.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Utility asset works · DERBY CITY COUNCIL · Give and take
Oct 2026 to Oct 2026 150 m away
Minor
Camden Street, DerbyUtility asset works · DERBY CITY COUNCIL · Give and take
Oct 2026 to Oct 2026 200 m away
Minor
Camden Street, DerbyUtility asset works · DERBY CITY COUNCIL · Give and take
Oct 2026 to Oct 2026 200 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Storage or Distribution of Goods · On land to the south of East Midlands Airport and south-west of M1 Junction 23A
Sept 2026 16.3 km away
Decided
Oaklands Farm Solar ParkGenerating Stations · Land at Rosliston Road, south of Drakelow Power Station
decided Jun 2025 22.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.