Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne.
application due June 2027 8.5 km away
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Rooftop solar
Armadillo Self Storage, Foresters Park Centre - Solar PanelsApproved, not yet built · 230 kW
Jun 2025 3.4 km away
Rooftop solar
Tenpin Bowling Derby, Foresters Park Centre - Solar PanelsApproved, not yet built · 190 kW
Sept 2023 3.4 km away
Running nearest: Sinfin Lane (energy from waste, 3.6 km); Derby Sewage Treatment Works (wind farm, 5.8 km); Toyota Solar Farm (solar farm, 7.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Oct 2026 to Oct 2026 600 m away
Minor
Drewry Lane, DerbyUtility asset works · DERBY CITY COUNCIL · Give and take
Oct 2026 to Oct 2026 650 m away
Minor
Drewry Lane, DerbyUtility asset works · DERBY CITY COUNCIL · Give and take
Oct 2026 to Oct 2026 650 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Storage or Distribution of Goods · On land to the south of East Midlands Airport and south-west of M1 Junction 23A
Sept 2026 16.6 km away
Decided
Oaklands Farm Solar ParkGenerating Stations · Land at Rosliston Road, south of Drakelow Power Station
decided Jun 2025 22.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.