What's changing near DE11 9EW
Within 2 km, around Castle Gresley, Overseal & Coton in South Derbyshire. Building, planning, schools, transport, prices and crime.
276new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+3.4%like-for-like prices in Castle Gresley, Overseal & Coton, 2024 → 2025 (council +2.8%)
+10%recorded crime, last 12 months vs the 12 before
On the map
New homesStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
13 new homes completedhouses · Jan 2025 – Oct 2026
planned Oct 2026
1.9 km away - New homes
67 new homes completedhouses · Nov 2024 – Oct 2026
planned Oct 2026
1.8 km away - New homes
7 new homes completedhouses · Mar 2025 – Oct 2026
Oct 2026
1.6 km away - New homes
38 new homes completedhouses · Oct 2025 – Sep 2026
Sept 2026
1.8 km away - New homes
7 new homes completedhouses · Feb 2026 – Sep 2026
Sept 2026
1.9 km away - New homes
12 new homes completedhouses · Nov 2024 – Sep 2026
Sept 2026
1.9 km away - New homes
15 new homes completedhouses · Jan 2026 – Jul 2026
Jul 2026
1.6 km away - New homes
44 new homes completed8 flats, 36 houses · Sep 2025 – Jul 2026
Jul 2026
1.6 km away - New homes
11 new homes completedhouses · Nov 2025 – May 2026
May 2026
1.5 km away - New homes
16 new homes completedhouses · May 2025 – Nov 2025
Nov 2025
1.9 km away - New homes
8 new homes completedhouses · Apr 2025 – Sep 2025
Sept 2025
550 m away - New homes
8 new homes completedhouses · Jun 2025 – Sep 2025
Sept 20251.8 km away
0homes extended 2021–2025
0since energy certificates began (2008)
0in DE11 9EW itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
96hours of spills in 2025 between them (typical neighbourhood: about 36)
44spill events counted
- Severn Trent Water
Hospital Lane Storm Overflowinto Darklands Brook28 spills, 70 hours in 2025
1.1 km away - Severn Trent Water
Cappy Farm Pumping Stationinto Castle Gresley Brook9 spills, 24 hours in 2025
900 m away - Severn Trent Water
Castle Gresley Burton Rd (Bonas)Spsinto Castle Gresley Brook1 spills, 1 hours in 2025
750 m away - Severn Trent Water
Coton Park Wwtwinto Darklands Brk Trib River Trent6 spills, 1 hours in 2025
750 m away - Severn Trent Water
Burton Road Combined Sewer Overflowinto A Trib Of Stanton Brook0 spills, 0 hours in 2025
750 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
29 planned, approved or being built and 10 running (53 MW between them). Those within 5 km are on the map above.
- Battery storage
Mount Road, Castle Gresley - Battery Storage FacilityApproved, not yet built · 20 MW
Jul 2022
600 m away - Energy from waste
Keith Willshee Way - Swadlincote Resource Recovery ParkApproved, not yet built · 20 MW
Aug 2025
850 m away - Battery storage
Breach Farm - Energy BarnApproved, not yet built · 40 MW
Aug 2017
1.4 km away - Battery storage
Park Road, Overseal - Battery Storage FacilityApproved, not yet built · 50 MW
Jul 2025
2.2 km away - Solar farm
Lullington Solar ParkPlanning application in · 44 MW
Jul 2025
2.5 km away - Battery storage
Caldwell Road - Battery StorageApproved, not yet built · 90 MW
Jul 2024
2.5 km away - Solar farm
Oaklands Solar Farm Project - Solar Farm & Battery StorageApproved, not yet built · 138 MW
Jun 2025
3.9 km away - Energy from waste
Drakelow Renewable Energy CentreBeing built · 15 MW
Sept 2019
4.6 km away - Battery storage
Oaklands Solar Farm Project - Solar Farm & Battery StorageApproved, not yet built · 38 MW
Jun 2025
5.0 km away - Rooftop solar
Meadowside Leisure Centre, High Street - Solar PanelsPlanning application in · 290 kW
Nov 2024
5.2 km away
Road and street works within 1 km
2 permitted works running now or planned, 1 of them major.
- Major, planned
Burton Road, SwadlincoteUtility asset works · CADENT GAS LIMITED · Multi-way signals
Dec 2026 to Jan 2027
950 m away - Standard
Burton Road, SwadlincoteUtility asset works · mua Electricity Limited · Two-way signals
Oct 2026 to Nov 2026
150 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Jun 2025
4.9 km away - Pre-application
Castle Way EnergyGenerating Stations · The proposed development includes five development sites (Sites A-E) which are situated in the rural expanse between Derby, Uttoxeter and Ashbourne. application due June 2027
10.6 km away - Decideddecided Dec 2014
10.8 km away - RecommendationSept 2026
19.5 km away - Decideddecided Aug 2023
19.9 km away - Decideddecided Jan 2016
21.3 km away - Recommendation
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Land at Coton Park Colliery (solar farm, 700 m); Bretby Power (landfill gas, 2.7 km); Midland Lead, Kiln Way - Solar Photovoltaic Panels (rooftop solar, 3.0 km); Shortheath Solar Park (solar farm, 4.4 km); Drakelow Solar Farm (solar farm, 4.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.