What's changing near DA9 9XJ
Within 2 km, around Ebbsfleet & Greenhithe in Dartford. Building, planning, schools, transport, prices and crime.
621new homes completed within 2 km, last 2 years
5homes given permission on brownfield sites since 2021
+2.0%like-for-like prices in Ebbsfleet & Greenhithe, 2024 → 2025 (council +1.7%)
-11%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
16 new homes completedhouses · Nov 2024 – Oct 2026
planned Oct 2026
1.5 km away - New homes
8 new homes completedhouses · Nov 2025 – Oct 2026
planned Oct 2026
1.4 km away - New homes
29 new homes completed11 flats, 18 houses · Apr 2025 – Oct 2026
planned Oct 2026
2.0 km away - New homes
5 new homes completedhouses · Oct 2025 – Oct 2026
Oct 2026
1.4 km away - New homes
20 new homes completedhouses · Aug 2026 – Oct 2026
Oct 2026
1.3 km away - New homes
8 new homes completedhouses · Apr 2026 – Aug 2026
Aug 2026
2.0 km away - New homes
58 new homes completedflats · Mar 2026 – Jul 2026
Jul 2026
1.8 km away - New homes
24 new homes completedhouses · Dec 2024 – Jun 2026
Jun 2026
1.4 km away - New homes
12 new homes completedhouses · Oct 2025 – Jun 2026
Jun 2026
1.4 km away - New homes
22 new homes completed13 flats, 9 houses · May 2025 – Jun 2026
Jun 2026
1.9 km away - New homes
39 new homes completed14 flats, 25 houses · Apr 2025 – May 2026
May 2026
1.4 km away - New homes
43 new homes completed9 flats, 34 houses · Jul 2025 – May 2026
24homes extended 2021–2025, typically adding 24 m²
38since energy certificates began (2008)
1in DA9 9XJ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
2hours of spills in 2025 between them (typical neighbourhood: about 36)
1spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
43 planned, approved or being built and 20 running (367 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Bluewater Shopping Centre, Upper Thames Walk - Solar Photovoltaic PanelApproved, not yet built · 1 MW
Apr 2023
1.7 km away - Rooftop solar
Riverbridge House, Admirals Park - Solar PanelsApproved, not yet built · 270 kW
Jul 2023
2.2 km away - Rooftop solar
Littlebrook Hospital, Bow Arrow Lane - Solar PanelsApproved, not yet built
Jun 2026
3.2 km away - Rooftop solar
Princes Road - Solar PanelsApproved, not yet built · 150 kW
Jan 2023
3.2 km away - Rooftop solar
Littlebrook DC1, Shield Road - Solar PanelsApproved, not yet built · 600 kW
Jul 2025
3.3 km away - Rooftop solar
Harris Academy Chafford Hundred, Chafford Hundred - Solar AarrayApproved, not yet built · 220 kW
Mar 2025
3.4 km away - Rooftop solar
Ford Retail, Triton Centre Weston Avenue - Solar PanelsApproved, not yet built · 790 kW
Jan 2023
3.5 km away - Battery storage
Pumping Station, West Thurrock Way - Micro Energy StorageApproved, not yet built · 200 kW
Oct 2024
3.6 km away - Battery storage
Thames Way, Northfleet - Battery Energy StoragePlanning application in · 100 MW
Aug 2025
3.6 km away - Hydrogen
Northfleet Mill, Crete Hall Road - Green Hydrogen ElectrolyserApproved, not yet built · 15 MW
Sept 20253.7 km away
Road and street works within 1 km
2 permitted works running now or planned, 2 of them major.
- Major
High Street, GreenhitheUtility asset works · BT · Road closure
Oct 2026 to Oct 2026
250 m away - Major
St Clements Way, GreenhitheOptional permit (no fee) e.g. for traffic management etc · KENT COUNTY COUNCIL · Lane closure
Sept 2026 to Oct 2026
650 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
Tilbury2Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury decided Feb 2019
6.9 km away - Decideddecided Mar 2025
7.3 km away - Decideddecided Feb 2022
7.5 km away - Decideddecided Nov 2025
10.6 km away - Decided
Riverside Energy ParkGenerating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020
11.0 km away - Decideddecided May 2022
17.9 km away - Decided
Transport schemes within 20 km
Running nearest: Littlebrook Battery Storage (battery storage, 2.8 km); Tilbury Docks (wind farm, 3.5 km); Longreach STW - extension (other, 4.1 km); Tilbury Green Power (biomass, 4.5 km); Port of Tilbury Green Hydrogen (hydrogen, 4.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.