Country England and Wales › Region South East › Council Dartford › Neighbourhood Ebbsfleet & Greenhithe › Postcode DA9 9PQ What's changing near DA9 9PQ Within 2 km, around Ebbsfleet & Greenhithe in Dartford. Building, planning, schools, transport, prices and crime.
1,036 new homes completed within 2 km, last 2 years
5 homes given permission on brownfield sites since 2021
+2.0% like-for-like prices in Ebbsfleet & Greenhithe, 2024 → 2025 (council +1.7%)
-11% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 16 new homes completed houses · Nov 2024 – Oct 2026
planned Oct 2026 1.3 km away New homes 8 new homes completed houses · Nov 2025 – Oct 2026
planned Oct 2026 1.3 km away New homes 5 new homes completed houses · Oct 2025 – Oct 2026
Oct 2026 1.3 km away New homes 23 new homes completed houses · Nov 2025 – Oct 2026
Oct 2026 1.4 km away New homes 21 new homes completed houses · Apr 2026 – Oct 2026
Oct 2026 1.6 km away New homes 50 new homes completed 46 flats, 4 houses · Dec 2025 – Oct 2026
Oct 2026 1.5 km away New homes 20 new homes completed houses · Aug 2026 – Oct 2026
Oct 2026 900 m away New homes 14 new homes completed houses · May 2026 – Aug 2026
Aug 2026 1.6 km away New homes 58 new homes completed flats · Mar 2026 – Jul 2026
Jul 2026 1.0 km away New homes 24 new homes completed houses · Dec 2024 – Jun 2026
Jun 2026 1.2 km away New homes 12 new homes completed houses · Oct 2025 – Jun 2026
Jun 2026 1.3 km away New homes 86 new homes completed flats · May 2026
Jun 2026 1.3 km away 20 homes extended 2021–2025, typically adding 23 m²
28 since energy certificates began (2008)
0 in DA9 9PQ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 43 planned, approved or being built and 20 running (366 MW between them). Those within 5 km are on the map above.
Rooftop solar Bluewater Shopping Centre, Upper Thames Walk - Solar Photovoltaic Panel Approved, not yet built · 1 MW
Apr 2023 1.0 km away Rooftop solar Riverbridge House, Admirals Park - Solar Panels Approved, not yet built · 270 kW
Jul 2023 1.4 km away Rooftop solar Littlebrook Hospital, Bow Arrow Lane - Solar Panels Approved, not yet built
Jun 2026 2.2 km away Rooftop solar Princes Road - Solar Panels Approved, not yet built · 150 kW
Jan 2023 2.2 km away Rooftop solar Littlebrook DC1, Shield Road - Solar Panels Approved, not yet built · 600 kW
Jul 2025 2.6 km away Rooftop solar One Hundred House, Brunel Way - Solar Panels Approved, not yet built · 770 kW
Aug 2023 3.3 km away Battery storage Darenth Road - Battery Energy Storage System Approved, not yet built · 100 MW
Oct 2025 3.4 km away Rooftop solar David Lloyd Sports Centre, Darenth Road - Solar Photo Voltaic System Approved, not yet built · 300 kW
Jan 2024 3.4 km away Rooftop solar Ford Retail, Triton Centre Weston Avenue - Solar Panels Approved, not yet built · 790 kW
Jan 2023 3.6 km away Rooftop solar Northern Gateway Distribution Centre,Central Road North - Solar Panels Planning application in · 550 kW
Jun 2026 3.7 km away Road and street works within 1 km 4 permitted works running now or planned, 3 of them major.
Major St Clements Way, Greenhithe Optional permit (no fee) e.g. for traffic management etc · KENT COUNTY COUNCIL · Lane closure
Sept 2026 to Oct 2026 400 m away Major High Street, Greenhithe Utility asset works · BT · Road closure
Oct 2026 to Oct 2026 900 m away Major St Clements Way, Greenhithe Optional permit (no fee) e.g. for traffic management etc · KENT COUNTY COUNCIL · Lane closure
Sept 2026 to Oct 2026 900 m away Standard St Clements Way, Greenhithe Optional permit (no fee) e.g. for traffic management etc · KENT COUNTY COUNCIL · Lane closure
Oct 2026 to Oct 2026 900 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided Tilbury2 Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury decided Feb 2019 7.8 km away Decided decided Mar 2025 8.2 km away Decided decided Feb 2022 8.5 km away Decided decided Nov 2025 10.1 km away Decided Riverside Energy Park Generating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020 10.4 km away Decided decided May 2022 18.1 km away Decided Transport schemes within 20 km Running nearest: Littlebrook Battery Storage (battery storage, 2.0 km); Longreach STW - extension (other, 3.4 km); Tilbury Docks (wind farm, 4.5 km); Tilbury Green Power (biomass, 5.5 km); Broadditch Battery Energy (battery storage, 5.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.