Country England and Wales › Region South East › Council Dartford › Neighbourhood Swanscombe › Postcode DA9 9FG What's changing near DA9 9FG Within 2 km, around Swanscombe in Dartford. Building, planning, schools, transport, prices and crime.
426 new homes completed within 2 km, last 2 years
5 homes given permission on brownfield sites since 2021
-1.7% like-for-like prices in Swanscombe, 2024 → 2025 (council +1.7%)
-4% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 16 new homes completed houses · Nov 2024 – Oct 2026
planned Oct 2026 1.8 km away New homes 8 new homes completed houses · Nov 2025 – Oct 2026
planned Oct 2026 1.8 km away New homes 5 new homes completed houses · Oct 2025 – Oct 2026
Oct 2026 1.7 km away New homes 20 new homes completed houses · Aug 2026 – Oct 2026
Oct 2026 1.7 km away New homes 24 new homes completed houses · Dec 2024 – Jun 2026
Jun 2026 1.7 km away New homes 12 new homes completed houses · Oct 2025 – Jun 2026
Jun 2026 1.7 km away New homes 39 new homes completed 14 flats, 25 houses · Apr 2025 – May 2026
May 2026 1.5 km away New homes 43 new homes completed 9 flats, 34 houses · Jul 2025 – May 2026
May 2026 1.5 km away New homes 63 new homes completed 27 flats, 36 houses · May 2025 – May 2026
May 2026 1.4 km away New homes 9 new homes completed houses · Feb 2026 – May 2026
May 2026 1.6 km away New homes 21 new homes completed houses · Feb 2025 – Mar 2026
Mar 2026 1.8 km away New homes 20 new homes completed 18 flats, 2 houses · Dec 2024 – Mar 2026
21 homes extended 2021–2025, typically adding 23 m²
34 since energy certificates began (2008)
1 in DA9 9FG itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
2 hours of spills in 2025 between them (typical neighbourhood: about 36)
1 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 42 planned, approved or being built and 20 running (367 MW between them). Those within 5 km are on the map above.
Rooftop solar Bluewater Shopping Centre, Upper Thames Walk - Solar Photovoltaic Panel Approved, not yet built · 1 MW
Apr 2023 2.1 km away Rooftop solar Riverbridge House, Admirals Park - Solar Panels Approved, not yet built · 270 kW
Jul 2023 2.5 km away Rooftop solar Harris Academy Chafford Hundred, Chafford Hundred - Solar Aarray Approved, not yet built · 220 kW
Mar 2025 3.1 km away Rooftop solar Morrisons - Solar Photovoltaic Panels Approved, not yet built · 430 kW
Apr 2022 3.3 km away Rooftop solar Tilbury Green Power Station - Solar PV Panels Approved, not yet built · 300 kW
Feb 2025 3.3 km away Rooftop solar Ford Retail, Triton Centre Weston Avenue - Solar Panels Approved, not yet built · 790 kW
Jan 2023 3.4 km away Hydrogen Northfleet Mill, Crete Hall Road - Green Hydrogen Electrolyser Approved, not yet built · 15 MW
Sept 2025 3.4 km away Battery storage Thames Way, Northfleet - Battery Energy Storage Planning application in · 100 MW
Aug 2025 3.4 km away Battery storage Pumping Station, West Thurrock Way - Micro Energy Storage Approved, not yet built · 200 kW
Oct 2024 3.5 km away Rooftop solar Kimberly Clark Limited, Northfleet Mill - Solar Pv System Approved, not yet built · 440 kW
Road and street works within 1 km 1 permitted works running now or planned, 1 of them major.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided Tilbury2 Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury decided Feb 2019 6.5 km away Decided decided Mar 2025 6.9 km away Decided decided Feb 2022 7.1 km away Decided decided Nov 2025 10.8 km away Decided Riverside Energy Park Generating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020 11.2 km away Decided decided May 2022 17.7 km away Decided Transport schemes within 20 km Running nearest: Littlebrook Battery Storage (battery storage, 3.0 km); Tilbury Docks (wind farm, 3.1 km); Tilbury Green Power (biomass, 4.1 km); Port of Tilbury Green Hydrogen (hydrogen, 4.2 km); Longreach STW - extension (other, 4.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.