Country England and Wales › Region South East › Council Dartford › Neighbourhood Newtown › Postcode DA2 6DW What's changing near DA2 6DW Within 2 km, around Newtown in Dartford. Building, planning, schools, transport, prices and crime.
760 new homes completed within 2 km, last 2 years
95 homes given permission on brownfield sites since 2021
+2.2% like-for-like prices in Newtown, 2024 → 2025 (council +1.7%)
-2% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 23 new homes completed houses · Nov 2025 – Oct 2026
Oct 2026 1000 m away New homes 21 new homes completed houses · Apr 2026 – Oct 2026
Oct 2026 1.1 km away New homes 50 new homes completed 46 flats, 4 houses · Dec 2025 – Oct 2026
Oct 2026 950 m away New homes 14 new homes completed houses · May 2026 – Aug 2026
Aug 2026 1.2 km away New homes 58 new homes completed flats · Jun 2026 – Jul 2026
Jul 2026 1.8 km away New homes 58 new homes completed flats · Mar 2026 – Jul 2026
Jul 2026 1.7 km away New homes 86 new homes completed flats · May 2026
Jun 2026 1.0 km away New homes 21 new homes completed flats · Mar 2026 – Jun 2026
Jun 2026 1.7 km away New homes 21 new homes completed houses · Nov 2024 – Apr 2026
Apr 2026 1.3 km away New homes 11 new homes completed houses · Apr 2026
Apr 2026 1.1 km away New homes 24 new homes completed flats · Nov 2025 – Mar 2026
Mar 2026 1.6 km away New homes 16 new homes completed 12 flats, 4 houses · Jan 2026
Jan 2026 900 m away 25 homes extended 2021–2025, typically adding 23 m²
33 since energy certificates began (2008)
1 in DA2 6DW itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 50 planned, approved or being built and 20 running (249 MW between them). Those within 5 km are on the map above.
Rooftop solar Littlebrook Hospital, Bow Arrow Lane - Solar Panels Approved, not yet built
Jun 2026 300 m away Rooftop solar Princes Road - Solar Panels Approved, not yet built · 150 kW
Jan 2023 650 m away Rooftop solar David Lloyd Sports Centre, Darenth Road - Solar Photo Voltaic System Approved, not yet built · 300 kW
Jan 2024 1.2 km away Battery storage Darenth Road - Battery Energy Storage System Approved, not yet built · 100 MW
Oct 2025 1.4 km away Rooftop solar Riverbridge House, Admirals Park - Solar Panels Approved, not yet built · 270 kW
Jul 2023 1.7 km away Rooftop solar Fairfield Pool, Lowfield Street - Solar Panels Approved, not yet built · 410 kW
Oct 2023 1.8 km away Rooftop solar Fairfield Centre, Lowfield Street - Solar Panels Approved, not yet built · 160 kW
Oct 2023 1.8 km away Rooftop solar Northern Gateway Distribution Centre,Central Road North - Solar Panels Planning application in · 550 kW
Jun 2026 1.8 km away Rooftop solar Northern Gateway Distribution Centre, Central Road North - Solar Panels Approved, not yet built · 840 kW
Jan 2024 2.0 km away Rooftop solar One Hundred House, Brunel Way - Solar Panels Approved, not yet built · 770 kW
Aug 2023 2.0 km away Road and street works within 1 km 9 permitted works running now or planned, 1 of them major.
Major Wayville Road, Dartford Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Oct 2026 to Oct 2026 550 m away Standard Chapel Drive, Dartford Utility repair and maintenance works · THAMES WATER · Give and take
Nov 2026 to Nov 2026 300 m away Standard The Brent, Dartford Utility asset works · KENT COUNTY COUNCIL · Two-way signals
Nov 2026 to Dec 2026 350 m away Standard Stone Lodge Road, Dartford Utility asset works · THAMES WATER · Multi-way signals
Oct 2026 to Oct 2026 550 m away Standard Princes Road, Dartford New service connection · Aurora Utilities Limited · Lane closure
Oct 2026 to Oct 2026 700 m away Standard Cotton Lane, Stone Works for road purposes · NATIONAL HIGHWAYS · No carriageway incursion
Oct 2026 to Oct 2026 950 m away Minor Watling Street, Stone Utility repair and maintenance works · THAMES WATER · No carriageway incursion
Oct 2026 to Oct 2026 550 m away Minor Kingsley Avenue, Dartford Utility asset works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026 800 m away Minor Cotton Lane, Stone Works for road purposes · NATIONAL HIGHWAYS · Lane closure
Dec 2026 to Dec 2026 950 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Nov 2025 8.9 km away Decided Riverside Energy Park Generating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020 9.2 km away Decided Tilbury2 Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury decided Feb 2019 10.1 km away Decided decided Mar 2025 10.1 km away Decided decided Feb 2022 10.8 km away Pre-application application due March 2028 17.1 km away Decided Transport schemes within 20 km Running nearest: Littlebrook Battery Storage (battery storage, 1.8 km); Longreach STW - extension (other, 2.6 km); Rainham Phase II (landfill gas, 6.1 km); Rainham Landfill Scheme, Phase I (landfill gas, 6.1 km); Sandy Lane Landfill Scheme (landfill gas, 6.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.