What's changing near DA18 4DZ
Within 2 km, around Crossway Park in Bexley. Building, planning, schools, transport, prices and crime.
275new homes completed within 2 km, last 2 years
19homes given permission on brownfield sites since 2021
+6.1%like-for-like prices in Crossway Park, 2024 → 2025 (council +2.5%)
+9%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
106 new homes completed101 flats, 5 houses · Oct 2025 – Oct 2026
planned Oct 2026
450 m away - New homes
133 new homes completedflats · Jan 2026 – Oct 2026
planned Oct 2026
600 m away - New homes
5 new homes completed2 flats, 3 houses · Nov 2025 – Jun 2026
Jun 2026
500 m away - Planning permissionApr 2024
1.6 km away - Planning permissionMay 2022
750 m away - New schoolSept 2021
2.0 km away - Planning permissionApr 2021
1.8 km away - New schoolApr 2021
1.5 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 19 postcodes nearby had new homes completed in the last two years.
Planning applications within 500 m
12applications in the last 12 months
10approved · 0 refused
2still being decided
1net new homes in approved schemes since 2023
- Application Under Consideration
2, Redstart House, Binsey Walk, SE2 9TRCondition 36 (Part G) - BinseyBexley 16/01287/OUTM25 · All Other
Sept 2026
500 m away - Application Under Consideration
30A, Hartslock Drive, SE2 9UTRetrospective conversion of ground floor unit to dwelling house (Class C3).Bexley 26/01611/LDCE · All Other
Aug 2026
250 m away - Approved
112, Overton Road, SE2 9SEErection of a two storey side extension following demolition of existing side garage including alterations to external steps and lowering of ground floor level to provide street-level access.Bexley 26/01041/FUL · All Other
Jun 2026
400 m away - Approved
114, Overton Road, SE2 9SEErection of a single storey rear extension, including replacement steps to the rear.Bexley 26/00892/FUL · All Other
May 2026
400 m away - Approved
24, St Edmunds Close, DA18 4DUConversion of garage to habitable room.Bexley 26/00436/FUL · All Other
May 2026
100 m away - Approved
114, Overton Road, SE2 9SELawful Development Certificate (Proposed) for the conversion of roof space involving alterations to existing roofline, including a hip to gable enlargement, a rear dormer extension and rooflights to front roofslopesBexley 26/00856/LDCP · All Other
Apr 2026
400 m away - Approved
54, Seacourt Road, SE2 9UPApplication to approve details of condition 4A (Secured by Design) pursuant to application 25/00754/FUL for the retrospective planning permission application for change of use from private dwelling use Class (C3) to Class C4 use as a small HMO for six people.
9homes extended 2021–2025, typically adding 29 m²
18since energy certificates began (2008)
1in DA18 4DZ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
74 planned, approved or being built and 23 running (169 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Thames Innovation Centre, Veridion Way - Solar PanelsApproved, not yet built · 170 kW
Jul 2025
950 m away - Anaerobic digestion
Riverside Energy Park (REP)Approved, not yet built · 19 MW
Apr 2020
1.9 km away - Energy from waste
Riverside Energy Park (REP)Being built · 81 MW
Jan 2023
1.9 km away - Battery storage
Riverside Energy ParkApproved, not yet built · 20 MW
Apr 2020
1.9 km away - Rooftop solar
Riverside Energy Park (REP)Approved, not yet built · 1 MW
Apr 2020
1.9 km away - Battery storage
Riverside Resource Recovery Facility Battery StorageBeing built · 3 MW
Dec 2020
2.0 km away - Energy from waste
Connect Waste (Chequers Lane)Planning application in · 20 MW
Mar 2020
2.6 km away - Battery storage
Atcost Road - Battery Storage FacilityPlanning application in · 100 MW
May 2024
2.8 km away - Energy from waste
Thames Gateway EfWApproved, not yet built · 19 MW
Nov 2014
2.9 km away - Rooftop solar
Thames Gateway Park, Choats Road - Solar PanelsApproved, not yet built · 470 kW
Jun 2023
3.1 km away - Rooftop solar
Nic Ice, Thames Road - Solar Panels
Road and street works within 1 km
11 permitted works running now or planned, 2 of them major.
- Major
Felixstowe Road, Abbey WoodHighway repair and maintenance works · LONDON BOROUGH OF BEXLEY · Two-way signals
Sept 2026 to Feb 2027
800 m away - Major
Yarnton Way, ErithHighway improvement works · LONDON BOROUGH OF BEXLEY · Road closure
Oct 2026 to Oct 2026
900 m away - Minor
Overton Road East, Abbey WoodHighway repair and maintenance works · LONDON BOROUGH OF BEXLEY · No carriageway incursion
Oct 2026 to Oct 2026
350 m away - Minor
Overton Road, Abbey WoodUtility asset works · THAMES WATER · No carriageway incursion
Oct 2026 to Oct 2026
450 m away - Minor
Overton Road, Abbey WoodUtility asset works · THAMES WATER · No carriageway incursion
Oct 2026 to Oct 2026
550 m away - Minor
Sydney Road, Abbey WoodUtility asset works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026
550 m away - Minor
Eastern Way, ThamesmeadHighway repair and maintenance works · LONDON BOROUGH OF BEXLEY · Lane closure
Apr 2027 to May 2027
700 m away - Minor
Eastern Way, ThamesmeadHighway repair and maintenance works · LONDON BOROUGH OF BEXLEY · Lane closure
Apr 2027 to Apr 2027
750 m away - Minor
Ricardo Path, ThamesmeadUtility repair and maintenance works · THAMES WATER · No carriageway incursion
Oct 2026 to Oct 2026
850 m away - Minor
Major infrastructure projects within 30 km
- Decided
Riverside Energy ParkGenerating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020
1.9 km away - Decideddecided Nov 2025
2.2 km away - Decided
Silvertown TunnelHighways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018
8.1 km away - Pre-applicationapplication due March 2028
8.8 km away - Decideddecided May 2022
15.5 km away - Decideddecided Mar 2025
15.5 km away - Decided
Transport schemes within 20 km
- Transport
Barking Riverside Overground stationNew station and Overground extension, opened July 2022
Jul 2022
2.7 km away - Transport
Northern line extension: Nine ElmsNew Underground station, opened September 2021
Sept 2021
17.9 km away - Transport
Northern line extension: Battersea Power StationNew Underground station, opened September 2021
Sept 2021
18.9 km away
Approved1, 3, Kite Close, SE2 9FBApplication under Section 73 of the Town and Country Planning Act 1990 to remove condition 1 (Opening Hours) to operate on an unrestricted basis of planning permission Ref: 24/00567/FUL for the application for Planning Permission for the use of existing commercial unit as a gymnasium (Use Class E(d)), as approved by planning permission 16/01251/FUL, with unrestricted hours of operation.Bexley 25/00255/FUL · All Other
Feb 2025
500 m away Running nearest: Crossness Sewage Works Turbine (wind farm, 1.1 km); Crossness Sewage Works (other, 1.1 km); Crossness Sewage Works PV (rooftop solar, 1.4 km); Twin Tumps Way - Solar Panels (rooftop solar, 2.0 km); East Dagenham Docks AD (AD) (anaerobic digestion, 2.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.