Country England and Wales › Region South East › Council Dartford › Neighbourhood Temple Hill & Marshes › Postcode DA1 5XR What's changing near DA1 5XR Within 2 km, around Temple Hill & Marshes in Dartford. Building, planning, schools, transport, prices and crime.
174 new homes completed within 2 km, last 2 years
173 homes given permission on brownfield sites since 2021
+3.4% like-for-like prices in Temple Hill & Marshes, 2024 → 2025 (council +1.7%)
-15% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 58 new homes completed flats · Jun 2026 – Jul 2026
Jul 2026 1.3 km away New homes 21 new homes completed flats · Mar 2026 – Jun 2026
Jun 2026 950 m away New homes 6 new homes completed flats · Mar 2026
Mar 2026 1.3 km away New homes 54 new homes completed flats · Nov 2025
Nov 2025 1.3 km away New homes 6 new homes completed flats · Sep 2025
Sept 2025 1.1 km away Planning permission Permission for 39 homes 52 - 62 West Hill / C Pearson E Bates Storage Yard And Workshops, West Hill, Dartford DA1 2EU (full planning permission) Jun 2025 1.2 km away New homes 16 new homes completed houses · Nov 2024 – Jan 2025
Jan 2025 2.0 km away Planning permission Permission for 23 homes Land At Highfield House, 2-4 West Hill And 74-76 Spital Street, Dartford (full planning permission) Dec 2024 1.1 km away Planning permission Jun 2024 1.3 km away Planning permission 8 homes extended 2021–2025, typically adding 23 m²
10 since energy certificates began (2008)
0 in DA1 5XR itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 3 storm overflows within 2 km
0 hours of spills in 2025 between them (typical neighbourhood: about 36)
0 spill events counted
Thames Water Priory Road, Dartford (Foul) into Darent 0 spills, 0 hours in 2025
700 m away Thames Water N/A into Not Applicable 0 spills, 0 hours in 2025
850 m away Thames Water Dartford Creek Storm into Darent/Dartford Creek 0 spills, 0 hours in 2025
950 m away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 55 planned, approved or being built and 25 running (262 MW between them). Those within 5 km are on the map above.
Rooftop solar Northern Gateway Distribution Centre,Central Road North - Solar Panels Planning application in · 550 kW
Jun 2026 150 m away Rooftop solar Northern Gateway Distribution Centre, Central Road North - Solar Panels Approved, not yet built · 840 kW
Jan 2024 300 m away Rooftop solar One Hundred House, Brunel Way - Solar Panels Approved, not yet built · 770 kW
Aug 2023 900 m away Rooftop solar Dartford Grammar School For Boys, West Hill - Solar Panels Approved, not yet built · 160 kW
Sept 2024 1.4 km away Rooftop solar Littlebrook Hospital, Bow Arrow Lane - Solar Panels Approved, not yet built
Jun 2026 1.5 km away Rooftop solar Fairfield Pool, Lowfield Street - Solar Panels Approved, not yet built · 410 kW
Oct 2023 1.6 km away Rooftop solar Fairfield Centre, Lowfield Street - Solar Panels Approved, not yet built · 160 kW
Oct 2023 1.6 km away Rooftop solar David Lloyd Sports Centre, Darenth Road - Solar Photo Voltaic System Approved, not yet built · 300 kW
Jan 2024 1.8 km away Rooftop solar Littlebrook DC1, Shield Road - Solar Panels Approved, not yet built · 600 kW
Jul 2025 1.9 km away Rooftop solar Princes Road - Solar Panels Approved, not yet built · 150 kW
Jan 2023 2.3 km away Road and street works within 1 km 8 permitted works running now or planned, 3 of them major.
Major Central Road, Dartford Utility repair and maintenance works · Aurora Utilities Limited · No carriageway incursion
Jul 2026 to Oct 2026 250 m away Major Hythe Street, Dartford Highway improvement works · KENT COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2027 800 m away Major Orchard Street, Dartford Highway improvement works · KENT COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2027 900 m away Standard Orchard Street, Dartford New service connection · UK POWER NETWORKS EASTERN & LONDON · Some carriageway incursion
Oct 2026 to Nov 2026 850 m away Immediate - urgent Mill Pond Road, Dartford Highway repair and maintenance works · KENT COUNTY COUNCIL · Some carriageway incursion
Aug 2026 to Oct 2026 600 m away Minor Chaucer Way, Dartford Permanent reinstatement · BT · Some carriageway incursion
Oct 2026 to Oct 2026 750 m away Minor Cornwall Road, Dartford Utility asset works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026 850 m away Minor Kingsley Avenue, Dartford Utility asset works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026 950 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Nov 2025 7.2 km away Decided Riverside Energy Park Generating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020 7.5 km away Decided decided Mar 2025 10.6 km away Decided Tilbury2 Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury decided Feb 2019 11.3 km away Decided decided Feb 2022 11.9 km away Decided Silvertown Tunnel Highways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018 15.5 km away Pre-application Transport schemes within 20 km Running nearest: Longreach STW - extension (other, 1.7 km); Littlebrook Battery Storage (battery storage, 2.0 km); Rainham Phase II (landfill gas, 4.6 km); Rainham Landfill Scheme, Phase I (landfill gas, 4.6 km); Aveley (landfill gas, 5.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.