Country England and Wales › Region South East › Council Gravesham › Neighbourhood Milton & Chalk › Postcode DA12 4UT What's changing near DA12 4UT Within 2 km, around Milton & Chalk in Gravesham. Building, planning, schools, transport, prices and crime.
11 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+0.6% like-for-like prices in Milton & Chalk, 2024 → 2025 (council +1.0%)
-22% recorded crime, last 12 months vs the 12 before
On the map
New homes School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New-home postcodes with fewer than 5 homes are counted above but not listed. 5 postcodes nearby had new homes completed in the last two years.
9 homes extended 2021–2025, typically adding 30 m²
18 since energy certificates began (2008)
1 in DA12 4UT itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 5 storm overflows within 2 km
185 hours of spills in 2025 between them (typical neighbourhood: about 36)
73 spill events counted
Southern Water Gravesend Wwtw into Tidal River Thames 42 spills, 120 hours in 2025
1.5 km away Southern Water Empress Rd Denton Catch Chamb' Cs0 into The Thames Estuary (Tidal) 21 spills, 47 hours in 2025
1.8 km away Southern Water Empress Rd Denton Catch Chamb' Cs0 into The Thames Estuary (Tidal) 8 spills, 17 hours in 2025
1.8 km away Southern Water Empress Rd Denton Catch Chamb' Cs0 into The Thames Estuary (Tidal) 2 spills, 1 hours in 2025
1.8 km away Southern Water Gravesend Wwtw into Tidal River Thames 0 spills, 0 hours in 2025
1.5 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 17 planned, approved or being built and 10 running (238 MW between them). Those within 5 km are on the map above.
Rooftop solar Lion Business Park, Dering Way - Solar panels Planning application in · 170 kW
Mar 2024 1.2 km away Rooftop solar Morrisons, Coldharbour Road - Solar Photovoltaics Panels Approved, not yet built · 310 kW
Dec 2022 3.8 km away Rooftop solar Kimberly Clark Limited, Northfleet Mill - Solar Pv System Approved, not yet built · 440 kW
Nov 2023 4.9 km away Hydrogen Northfleet Mill, Crete Hall Road - Green Hydrogen Electrolyser Approved, not yet built · 15 MW
Sept 2025 4.9 km away Battery storage Thames Way, Northfleet - Battery Energy Storage Planning application in · 100 MW
Aug 2025 5.2 km away Rooftop solar Millbrook Garden Centre, Station Road - Solar Photovoltaic Panels Approved, not yet built · 470 kW
Dec 2022 6.7 km away Battery storage New Barn Road - Battery Energy Storage Facility Approved, not yet built · 35 MW
Feb 2024 6.7 km away Rooftop solar Tilbury Green Power Station - Solar PV Panels Approved, not yet built · 300 kW
Feb 2025 6.8 km away Battery storage Sundridge Hill Being built · 50 MW
Feb 2022 7.2 km away Rooftop solar Morrisons Supermarket, Rochester - Solar panels Approved, not yet built
May 2022 7.3 km away Road and street works within 1 km No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided Tilbury2 Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury decided Feb 2019 3.5 km away Decided decided Feb 2022 3.8 km away Decided decided Mar 2025 8.9 km away Decided decided Nov 2025 19.1 km away Decided Riverside Energy Park Generating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020 19.5 km away Decided decided May 2022 22.7 km away Decided Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Thurrock Flexible Generation Plant (battery storage, 3.4 km); Barvills Solar Farm (solar farm, 4.8 km); Port of Tilbury Green Hydrogen (hydrogen, 4.8 km); Tilbury Green Power (biomass, 5.2 km); Tilbury LCY2 (rooftop solar, 5.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.