Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
15storm overflows within 2 km
389hours of spills in 2025 between them (typical neighbourhood: about 36)
204spill events counted
Anglian Water
Tilbury Water Recycling Centreinto Ouse (Newport Pagnell To Roxton)64 spills, 142 hours in 2025
1.7 km away
Southern Water
Gravesend Wwtwinto Tidal River Thames42 spills, 120 hours in 2025
1.1 km away
Southern Water
Empress Rd Denton Catch Chamb' Cs0into The Thames Estuary (Tidal)21 spills, 47 hours in 2025
800 m away
Southern Water
Singlewell Road Gravesend 123 Csointo Tidal River Thames3 spills, 22 hours in 2025
1.6 km away
Southern Water
Empress Rd Denton Catch Chamb' Cs0into The Thames Estuary (Tidal)8 spills, 17 hours in 2025
800 m away
Southern Water
Milton Road Gravesend Csointo Tidal River Thames11 spills, 17 hours in 2025
1.1 km away
Southern Water
Old Road West Gravesend Csointo Tidal River Thames16 spills, 10 hours in 2025
24 Stone Street Gravesend Kent DA11 0NP (full planning permission)
Jun 2021 1.4 km away
Planning permission
Permission for 7 homes24 And 24C Queen Street Gravesend Kent DA12 2EE (full planning permission)
May 2021 1.3 km away
Planning permission
Permission for 12 homes44 - 46 The Grove Gravesend Kent DA12 1DF (Job Centre) (full planning permission)
Apr 2021 1.2 km away
Planning permission
Permission for 8 homes29 - 30 High Street Gravesend Kent DA11 0AZ (full planning permission)
Feb 2021 1.4 km away
New school
New school: Estuary AcademyAcademy alternative provision sponsor led, academy alternative provision sponsor led
Sept 2020 950 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 23 postcodes nearby had new homes completed in the last two years.
Apr 2023 8.0 km away
Rooftop solar
Harris Academy Chafford Hundred, Chafford Hundred - Solar AarrayApproved, not yet built · 220 kW
Mar 2025 8.2 km away
Battery storage
Sundridge HillBeing built · 50 MW
Feb 2022 8.6 km away
Running nearest: Thurrock Flexible Generation Plant (battery storage, 2.3 km); Port of Tilbury Green Hydrogen (hydrogen, 3.3 km); Tilbury Green Power (biomass, 3.7 km); Tilbury LCY2 (rooftop solar, 4.2 km); London Distribution Park (battery storage, 4.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Generating Stations · Land within the south-eastern part of the Kemsley Paper Mill, Kemsley, Sittingbourne.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.