What's changing near DA11 8SP
Within 2 km, around Northfleet South in Gravesham. Building, planning, schools, transport, prices and crime.
154new homes completed within 2 km, last 2 years
85homes given permission on brownfield sites since 2021
+0.4%like-for-like prices in Northfleet South, 2024 → 2025 (council +1.0%)
+0%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
10 new homes completedflats · Oct 2026
planned Oct 2026
2.0 km away - New homes
6 new homes completedflats · Sep 2026
Sept 2026
1000 m away - New homes
47 new homes completedflats · Jul 2026
Jul 2026
1.9 km away - New homes
23 new homes completedflats · Jun 2026
Jun 2026
1.9 km away - New homes
7 new homes completedflats · Oct 2025
Oct 2025
1.9 km away - New homes
9 new homes completedflats · Sep 2025
Sept 2025
1.8 km away - New homes
6 new homes completedhouses · Jan 2025
Jan 2025
1.9 km away - New homes
8 new homes completed3 flats, 5 houses · Nov 2024
Nov 2024
1.8 km away - New homes
10 new homes completedflats · Nov 2024
Nov 2024
1.8 km away - Planning permissionFeb 2023
2.0 km away - Planning permission
14homes extended 2021–2025, typically adding 39 m²
25since energy certificates began (2008)
2in DA11 8SP itself
- Extendedcertificate 2022
- Extendedcertificate 2017
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
2hours of spills in 2025 between them (typical neighbourhood: about 36)
8spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
35 planned, approved or being built and 14 running (301 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Morrisons, Coldharbour Road - Solar Photovoltaics PanelsApproved, not yet built · 310 kW
Dec 2022
1.1 km away - Battery storage
Thames Way, Northfleet - Battery Energy StoragePlanning application in · 100 MW
Aug 2025
1.3 km away - Hydrogen
Northfleet Mill, Crete Hall Road - Green Hydrogen ElectrolyserApproved, not yet built · 15 MW
Sept 2025
1.8 km away - Rooftop solar
Kimberly Clark Limited, Northfleet Mill - Solar Pv SystemApproved, not yet built · 440 kW
Nov 2023
1.9 km away - Rooftop solar
Millbrook Garden Centre, Station Road - Solar Photovoltaic PanelsApproved, not yet built · 470 kW
Dec 2022
2.5 km away - Battery storage
New Barn Road - Battery Energy Storage FacilityApproved, not yet built · 35 MW
Feb 2024
2.5 km away - Rooftop solar
Lion Business Park, Dering Way - Solar panelsPlanning application in · 170 kW
Mar 2024
3.6 km away - Rooftop solar
Tilbury Green Power Station - Solar PV PanelsApproved, not yet built · 300 kW
Feb 2025
4.8 km away - Rooftop solar
Bluewater Shopping Centre, Upper Thames Walk - Solar Photovoltaic PanelApproved, not yet built · 1 MW
Apr 2023
5.2 km away - Rooftop solar
Morrisons - Solar Photovoltaic PanelsApproved, not yet built · 430 kW
Road and street works within 1 km
6 permitted works running now or planned, 1 of them major.
- Major
Hall Road, GravesendOptional permit (no fee) e.g. for traffic management etc · KENT COUNTY COUNCIL · Lane closure
Oct 2026 to Oct 2026
1000 m away - Standard
Mulberry Road, GravesendRemedial works · BT · Give and take
Oct 2026 to Oct 2026
850 m away - Minor
Hall Road, GravesendHighway improvement works · KENT COUNTY COUNCIL · Stop/go boards
Oct 2026 to Oct 2026
350 m away - Minor
Park Avenue, GravesendUtility repair and maintenance works · SOUTHERN WATER · Some carriageway incursion
Oct 2026 to Oct 2026
700 m away - Minor
Springhead Road, GravesendHighway improvement works · KENT COUNTY COUNCIL · Stop/go boards
Oct 2026 to Oct 2026
900 m away - Minor
Lanes Avenue, GravesendUtility repair and maintenance works · SOUTHERN WATER · Some carriageway incursion
Oct 2026 to Oct 2026
1000 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
Tilbury2Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury decided Feb 2019
4.3 km away - Decideddecided Feb 2022
5.1 km away - Decideddecided Mar 2025
8.3 km away - Decideddecided Nov 2025
15.5 km away - Decided
Riverside Energy ParkGenerating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020
15.9 km away - Decideddecided May 2022
21.3 km away - Decided
Transport schemes within 20 km
Running nearest: Broadditch Battery Energy (battery storage, 2.0 km); Port of Tilbury Green Hydrogen (hydrogen, 3.2 km); Tilbury Docks (wind farm, 3.3 km); Tilbury Green Power (biomass, 3.6 km); Thurrock Flexible Generation Plant (battery storage, 4.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.