Country England and Wales › Region South East › Council Gravesham › Neighbourhood Northfleet South › Postcode DA11 8AD What's changing near DA11 8AD Within 2 km, around Northfleet South in Gravesham. Building, planning, schools, transport, prices and crime.
272 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+0.4% like-for-like prices in Northfleet South, 2024 → 2025 (council +1.0%)
+0% recorded crime, last 12 months vs the 12 before
On the map
New homes School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 7 new homes completed houses · Feb 2025 – Oct 2026
Oct 2026 1.7 km away New homes 6 new homes completed flats · Sep 2026
Sept 2026 1.5 km away New homes 21 new homes completed 2 flats, 19 houses · Jul 2025 – Sep 2026
Sept 2026 1.7 km away New homes 16 new homes completed 2 flats, 14 houses · Jul 2026 – Aug 2026
Aug 2026 1.8 km away New homes 24 new homes completed houses · Mar 2026 – Aug 2026
Aug 2026 1.7 km away New homes 47 new homes completed flats · Jul 2026
Jul 2026 1.9 km away New homes 8 new homes completed flats · Jul 2026
Jul 2026 1.7 km away New homes 12 new homes completed houses · Jul 2025 – Jul 2026
Jul 2026 1.7 km away New homes 23 new homes completed flats · Jun 2026
Jun 2026 1.9 km away New homes 16 new homes completed houses · Jul 2025 – Mar 2026
Mar 2026 1.7 km away New homes 12 new homes completed 1 flats, 11 houses · Jun 2025
Jul 2025 1.7 km away New homes 12 new homes completed 3 flats, 9 houses · Feb 2025 – Jul 2025
Jul 2025 1.7 km away 7 homes extended 2021–2025, typically adding 39 m²
14 since energy certificates began (2008)
0 in DA11 8AD itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
7 hours of spills in 2025 between them (typical neighbourhood: about 36)
2 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 36 planned, approved or being built and 15 running (303 MW between them). Those within 5 km are on the map above.
Battery storage Thames Way, Northfleet - Battery Energy Storage Planning application in · 100 MW
Aug 2025 450 m away Hydrogen Northfleet Mill, Crete Hall Road - Green Hydrogen Electrolyser Approved, not yet built · 15 MW
Sept 2025 1.4 km away Rooftop solar Kimberly Clark Limited, Northfleet Mill - Solar Pv System Approved, not yet built · 440 kW
Nov 2023 1.4 km away Rooftop solar Millbrook Garden Centre, Station Road - Solar Photovoltaic Panels Approved, not yet built · 470 kW
Dec 2022 1.9 km away Battery storage New Barn Road - Battery Energy Storage Facility Approved, not yet built · 35 MW
Feb 2024 1.9 km away Rooftop solar Morrisons, Coldharbour Road - Solar Photovoltaics Panels Approved, not yet built · 310 kW
Dec 2022 2.1 km away Rooftop solar Bluewater Shopping Centre, Upper Thames Walk - Solar Photovoltaic Panel Approved, not yet built · 1 MW
Apr 2023 4.1 km away Rooftop solar Tilbury Green Power Station - Solar PV Panels Approved, not yet built · 300 kW
Feb 2025 4.2 km away Rooftop solar Lion Business Park, Dering Way - Solar panels Planning application in · 170 kW
Mar 2024 4.5 km away Rooftop solar Morrisons - Solar Photovoltaic Panels Approved, not yet built · 430 kW
Road and street works within 1 km 6 permitted works running now or planned, 2 of them major.
Major Hall Road, Gravesend Optional permit (no fee) e.g. for traffic management etc · KENT COUNTY COUNCIL · Lane closure
Oct 2026 to Oct 2026 600 m away Major Thames Way, Gravesend Utility asset works · UK POWER NETWORKS SOUTH EASTERN · Multi-way signals
Sept 2026 to Nov 2026 650 m away Minor Springhead Road, Gravesend Highway improvement works · KENT COUNTY COUNCIL · Stop/go boards
Oct 2026 to Oct 2026 300 m away Minor Hall Road, Gravesend Highway improvement works · KENT COUNTY COUNCIL · Stop/go boards
Oct 2026 to Oct 2026 800 m away Minor Dover Road, Gravesend Utility repair and maintenance works · SOUTHERN WATER · Multi-way signals
Feb 2027 to Feb 2027 950 m away Minor Thames Way, Gravesend Optional permit (no fee) e.g. for traffic management etc · KENT COUNTY COUNCIL · Lane closure
Nov 2026 to Nov 2026 950 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided Tilbury2 Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury decided Feb 2019 4.7 km away Decided decided Feb 2022 5.5 km away Decided decided Mar 2025 7.9 km away Decided decided Nov 2025 14.4 km away Decided Riverside Energy Park Generating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020 14.7 km away Decided decided May 2022 20.5 km away Decided Transport schemes within 20 km Running nearest: Broadditch Battery Energy (battery storage, 2.2 km); Tilbury Docks (wind farm, 2.7 km); Port of Tilbury Green Hydrogen (hydrogen, 3.1 km); Tilbury Green Power (biomass, 3.3 km); Tilbury LCY2 (rooftop solar, 4.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.