Country England and Wales › Region South East › Council Dartford › Neighbourhood Swanscombe › Postcode DA10 0LD What's changing near DA10 0LD Within 2 km, around Swanscombe in Dartford. Building, planning, schools, transport, prices and crime.
681 new homes completed within 2 km, last 2 years
5 homes given permission on brownfield sites since 2021
-1.7% like-for-like prices in Swanscombe, 2024 → 2025 (council +1.7%)
-4% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 16 new homes completed houses · Nov 2024 – Oct 2026
planned Oct 2026 1.8 km away New homes 8 new homes completed houses · Nov 2025 – Oct 2026
planned Oct 2026 1.7 km away New homes 29 new homes completed 11 flats, 18 houses · Apr 2025 – Oct 2026
planned Oct 2026 1.7 km away New homes 5 new homes completed houses · Oct 2025 – Oct 2026
Oct 2026 1.7 km away New homes 20 new homes completed houses · Aug 2026 – Oct 2026
Oct 2026 2.0 km away New homes 21 new homes completed 2 flats, 19 houses · Jul 2025 – Sep 2026
Sept 2026 1.8 km away New homes 16 new homes completed 2 flats, 14 houses · Jul 2026 – Aug 2026
Aug 2026 1.7 km away New homes 24 new homes completed houses · Mar 2026 – Aug 2026
Aug 2026 1.7 km away New homes 8 new homes completed houses · Apr 2026 – Aug 2026
Aug 2026 1.6 km away New homes 12 new homes completed houses · Jul 2025 – Jul 2026
Jul 2026 1.7 km away New homes 24 new homes completed houses · Dec 2024 – Jun 2026
Jun 2026 1.8 km away New homes 12 new homes completed houses · Oct 2025 – Jun 2026
11 homes extended 2021–2025, typically adding 28 m²
19 since energy certificates began (2008)
2 in DA10 0LD itself
Extended certificate 2022 Extended certificate 2022 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 2 storm overflows within 2 km
8 hours of spills in 2025 between them (typical neighbourhood: about 36)
3 spill events counted
Southern Water Northfleet Wwtw into Tidal River Thames 2 spills, 7 hours in 2025
1.6 km away Southern Water Manor Way Swanscombe Ceo into Unnamed Trib Of River Thames 1 spills, 2 hours in 2025
550 m away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 39 planned, approved or being built and 22 running (374 MW between them). Those within 5 km are on the map above.
Rooftop solar Bluewater Shopping Centre, Upper Thames Walk - Solar Photovoltaic Panel Approved, not yet built · 1 MW
Apr 2023 2.4 km away Battery storage Thames Way, Northfleet - Battery Energy Storage Planning application in · 100 MW
Aug 2025 2.5 km away Hydrogen Northfleet Mill, Crete Hall Road - Green Hydrogen Electrolyser Approved, not yet built · 15 MW
Sept 2025 2.5 km away Rooftop solar Kimberly Clark Limited, Northfleet Mill - Solar Pv System Approved, not yet built · 440 kW
Nov 2023 2.6 km away Rooftop solar Tilbury Green Power Station - Solar PV Panels Approved, not yet built · 300 kW
Feb 2025 3.1 km away Rooftop solar Millbrook Garden Centre, Station Road - Solar Photovoltaic Panels Approved, not yet built · 470 kW
Dec 2022 3.2 km away Battery storage New Barn Road - Battery Energy Storage Facility Approved, not yet built · 35 MW
Feb 2024 3.2 km away Rooftop solar Riverbridge House, Admirals Park - Solar Panels Approved, not yet built · 270 kW
Jul 2023 3.4 km away Rooftop solar Morrisons - Solar Photovoltaic Panels Approved, not yet built · 430 kW
Apr 2022 3.4 km away Rooftop solar Harris Academy Chafford Hundred, Chafford Hundred - Solar Aarray Approved, not yet built · 220 kW
Road and street works within 1 km 3 permitted works running now or planned, 2 of them major.
Major, planned Lower Road, Gravesend Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Two-way signals
Oct 2026 to Nov 2026 1000 m away Major Lower Road, Gravesend Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Two-way signals
Nov 2026 to Nov 2026 1000 m away Immediate - urgent Gunn Road, Swanscombe Highway repair and maintenance works · KENT COUNTY COUNCIL · Some carriageway incursion
Sept 2026 to Oct 2026 800 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided Tilbury2 Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury decided Feb 2019 5.7 km away Decided decided Feb 2022 6.4 km away Decided decided Mar 2025 6.9 km away Decided decided Nov 2025 11.8 km away Decided Riverside Energy Park Generating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020 12.2 km away Decided decided May 2022 18.3 km away Decided Transport schemes within 20 km Running nearest: Tilbury Docks (wind farm, 2.5 km); Tilbury Green Power (biomass, 3.4 km); Port of Tilbury Green Hydrogen (hydrogen, 3.5 km); Littlebrook Battery Storage (battery storage, 4.0 km); Tilbury LCY2 (rooftop solar, 4.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.