Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
110hours of spills in 2025 between them (typical neighbourhood: about 36)
55spill events counted
United Utilities
Bradeley Hall Road Csointo Fowle Brook Via Sws24 spills, 49 hours in 2025
1000 m away
United Utilities
Tbcinto Fowle Brook17 spills, 44 hours in 2025
1.4 km away
United Utilities
Junc Hungerford Road And Laurestoninto Drain, Trib Of Valley Brook14 spills, 17 hours in 2025
22 planned, approved or being built and 7 running (20 MW between them). Those within 5 km are on the map above.
Rooftop solar
Crewe Hall Hotel, Weston Road - Solar PanelsPlanning application in
Oct 2025 1.6 km away
Solar farm
Middlewich Road - Solar Photovoltaics & Battery StorageApproved, not yet built · 5 MW
Mar 2022 2.2 km away
Battery storage
Middlewich Road - Solar Photovoltaics & Battery StorageApproved, not yet built · 25 MW
Mar 2022 2.2 km away
Rooftop solar
The Food Warehouse, Grand Junction Way - Solar PanelsApproved, not yet built · 170 kW
Sept 2025 2.6 km away
Rooftop solar
Eagle Bridge Health and Wellbeing Centre, Dunwoody Way - Solar panelsApproved, not yet built · 440 kW
Mar 2024 3.8 km away
Solar farm
Drury LaneApproved, not yet built · 17 MW
Feb 2021 4.9 km away
Rooftop solar
Bentley Motors, Pyms Lane - Solar PanelsApproved, not yet built · 560 kW
May 2025 5.0 km away
Rooftop solar
Building A6, Bentley Motors Limited, Pyms Lane - Roof mounted solar photovoltaicsApproved, not yet built · 170 kW
May 2022 5.1 km away
Rooftop solar
Pyms Lane - Solar PV PanelsApproved, not yet built · 460 kW
May 2022 5.1 km away
Rooftop solar
Building B2, Bentley Motors Limited, Pyms Lane - Solar PV PanelsApproved, not yet built · 220 kW
May 20225.2 km away
Road and street works within 1 km
4 permitted works running now or planned, 2 of them major.
Major, planned
Haslington By-Pass, HaslingtonHighway repair and maintenance works · CHESHIRE EAST COUNCIL · Road closure
Dec 2026 to Dec 2026 1000 m away
Major
Haslington By-Pass, HaslingtonHighway repair and maintenance works · CHESHIRE EAST COUNCIL · Road closure
Nov 2026 to Nov 2026 1000 m away
Standard
Primrose Avenue, HaslingtonNew service connection · MANWEB · Some carriageway incursion
Oct 2026 to Oct 2026 650 m away
Standard
The Dingle, HaslingtonNew service connection · MANWEB · Temp obstruction 15 minute delay
Oct 2026 to Oct 2026 800 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Salinae Hydrogen Storage projectUnderground Gas Storage Facilities · The site is located approximately 5.2km south west of the town of Middlewich, west of Warmingham, in the Cheshire East Council area. It is partly on the site of the existing British Salt/Kistos Energy Storage facility.
application due July 2027 6.6 km away
Decided
Keuper Gas Storage ProjectUnderground Gas Storage Facilities · Holford Brinefield, approximately 3km north of Middlewich, Cheshire.
decided Mar 2017 14.3 km away
Pre-application
Keuper Underground Gas Storage Facility Material Change 1Underground Gas Storage Facilities · Holford Brinefield, Cheshire, approximately 3km due West of the M6 and 3km North of Junction 18. This area is bounded to the west by the A530 (King Street) and to the east by the B5081.The Gas Processing Plant (GPP) will be located approximately 369886 East, 370226 North.
application due April 2027 15.1 km away
Pre-application
Peak Cluster CCS PipelineOther Pipe-lines · A carbon dioxide transport pipeline network connecting carbon capture sites in Derbyshire, Staffordshire and Cheshire to a coastal location on the Wirral peninsula
application due September 2027 19.0 km away
Decided
Meaford Energy CentreGenerating Stations · Former Meaford Power Station site, east of Meaford Road, to the north of the town of Stone
decided Jul 2016 24.6 km away
Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Haslington & Weston: +33% over five years (2020 → 2025).
Council tax list: 200 homes added in the neighbourhood since April 2024.
Population (GP registrations): +3.8% in two years.
Permission for 47 homesSydney Cottage Farm, Herbert Street, Crewe (full planning permission)
Dec 2023 1.6 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 17 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Bentley Motors Limited, Pyms Lane - Solar PanelsApproved, not yet built · 1 MW
May 2025 5.2 km away
Rooftop solar
Building L1, Bentley Motors Limited, Pyms Lane - Solar PanelsApproved, not yet built · 490 kW
Jun 2022 5.4 km away
Running nearest: Maw Green Landfill Site (landfill gas, 2.6 km); Maw Green Landfill Site, Cheshire (Extension) (landfill gas, 2.6 km); Bentley Motors (rooftop solar, 5.2 km); Bentley Motors Ltd 1 (rooftop solar, 5.2 km); Land south of Wood Lane (Safeguard Bradwell) (solar farm, 6.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Hynet North West Hydrogen PipelineGas Transporter Pipe-lines · An approximate 125km pipeline centred approximately 1km south west of Lower Whitley, Cheshire
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.