Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
56hours of spills in 2025 between them (typical neighbourhood: about 36)
Arrow Valley SolarGenerating Stations · approximately 4km south west of Alcester within the administrative area of Wychavon District Council, Stratford-on-Avon District Council and Redditch Borough Council.
application due April 2027 28.0 km away
Pre-application
Daventry International Rail Freight Terminal Phase 4 (DIRFT 4)Storage or Distribution of Goods · The site extends to approximately 255 hectares and lies wholly within the administrative area of West Northamptonshire, c. 7km east of Rugby and c.11.5km north of Daventry. The M1 runs immediately adjacent to the western boundary of the Site, and it is located c.1km to the north of Junction 18 of the M1. DIRFT III (the latest phase of development at DIRFT) is located immediately west of the site across the M1 motorway. The site is c.1.3km to the north of the village of Crick and c.800m to west of the village of Yelvertoft.
Transport schemes within 20 km
Transport
HS2: Interchange station (Solihull)Under construction, near the NEC and Birmingham Airport
under construction 15.5 km away
The longer view
Like-for-like prices in Kenilworth West: +8% over five years (2020 → 2025).
Council tax list: 50 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.0% in two years.
Beechwood Farm, Hodgetts Lane - Battery StorageApproved, not yet built · 57 MW
Jan 2025 6.3 km away
Battery storage
Beechwood Farm, Hodgetts Lane - Battery StoragePlanning application in · 57 MW
Jul 2024 6.3 km away
Running nearest: Waverley Wood II (landfill gas, 7.4 km); Wolseley National Distribution Centre (rooftop solar, 8.0 km); Coventry (energy from waste, 8.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.