Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Daventry International Rail Freight Terminal Phase 4 (DIRFT 4)Storage or Distribution of Goods · The site extends to approximately 255 hectares and lies wholly within the administrative area of West Northamptonshire, c. 7km east of Rugby and c.11.5km north of Daventry. The M1 runs immediately adjacent to the western boundary of the Site, and it is located c.1km to the north of Junction 18 of the M1. DIRFT III (the latest phase of development at DIRFT) is located immediately west of the site across the M1 motorway. The site is c.1.3km to the north of the village of Crick and c.800m to west of the village of Yelvertoft.
11 new homes completedhouses · Aug 2025 – Oct 2025
Oct 2025 1.5 km away
New homes
11 new homes completedhouses · Jun 2025 – Oct 2025
Oct 2025 1.7 km away
New homes
5 new homes completedhouses · Jun 2025 – Sep 2025
Sept 2025 1.9 km away
New homes
12 new homes completedhouses · May 2025 – Aug 2025
Aug 2025 1.7 km away
New homes
14 new homes completed6 flats, 8 houses · Dec 2024 – Mar 2025
Mar 2025 1.8 km away
New homes
13 new homes completedhouses · Dec 2024 – Feb 2025
Feb 2025 1.7 km away
New homes
5 new homes completedhouses · Oct 2024 – Feb 2025
Feb 2025 950 m away
New homes
7 new homes completedhouses · Oct 2024
Nov 2024 1.7 km away
Planning permission
Permission for 3 homesThe Piggeries, Dadleys Wood, Wall Hill Road (full planning permission)
Feb 2023 1.5 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 29 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Sidney Stringer Academy, Primrose Hill Street - Solar PanelsApproved, not yet built · 200 kW
Sept 2025 4.8 km away
Battery storage
Torrington Avenue Battery Storage FacilityApproved, not yet built · 30 MW
Apr 2024 4.8 km away
Running nearest: Coventry National Grid Substation (battery storage, 6.5 km); Coventry (energy from waste, 6.6 km); Land South of Pogmore Spinney (solar farm, 7.1 km); Packington Generation Plant Phase 3 (landfill gas, 9.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Railways · Between Redditch and Alvechurch
decided Oct 2013 29.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.