What's changing near CV5 7HH
Within 2 km, around Allesley Green & Lower Eastern Green in Coventry. Building, planning, schools, transport, prices and crime.
15new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+0.8%like-for-like prices in Allesley Green & Lower Eastern Green, 2024 → 2025 (council +2.5%)
-19%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 5 postcodes nearby had new homes completed in the last two years.
25homes extended 2021–2025, typically adding 32 m²
41since energy certificates began (2008)
1in CV5 7HH itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
13hours of spills in 2025 between them (typical neighbourhood: about 36)
11spill events counted
- Severn Trent Water
Eastern Green - Unicorn Lane Csointo Brookstray4 spills, 7 hours in 2025
550 m away - Severn Trent Water
Brookside Avenue Csointo Brookstray3 spills, 4 hours in 2025
1.2 km away - Severn Trent Water
Coventry - Maudslay Road (Cso)into Trib Of River Sherbourne3 spills, 1 hours in 2025
1.7 km away - Severn Trent Water
Allesley - Birmingham Road (Cso)into Pickford Brook1 spills, 0 hours in 2025
1.2 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
52 planned, approved or being built and 3 running (59 MW between them). Those within 5 km are on the map above.
- Battery storage
Torrington Avenue Battery Storage FacilityApproved, not yet built · 30 MW
Apr 2024
1.6 km away - Battery storage
Tanners Lane - Battery Energy Storage SystemApproved, not yet built · 30 MW
Jun 2025
2.7 km away - Rooftop solar
Automotive Trim Developments, Priory Mill - Solar PanelsApproved, not yet built · 420 kW
Jun 2024
2.7 km away - Rooftop solar
Sky Dome - Solar PhotovoltaicsApproved, not yet built · 420 kW
Jul 2021
3.4 km away - Battery storage
Benton Green Lane - Battery Energy Storage SystemPlanning application in · 70 MW
Jun 2025
3.6 km away - Battery storage
Hill House Farm, Coventry Road - Battery Energy Storage SystemPlanning application in · 20 MW
Apr 2025
3.9 km away - Battery storage
Hodgetts Lane, Berkswell - Electricity Storage FacilityApproved, not yet built · 50 MW
Jan 2025
4.0 km away - Battery storage
Hodgetts Lane, Berkswell - Electricity Storage FacilityPlanning application in · 50 MW
Jul 2024
4.0 km away - Battery storage
Hodgetts Lane, Berkswell - Electricity Storage FacilityPlanning application in · 50 MW
Jul 2023
4.0 km away - Battery storage
Beechwood Farm, Hodgetts Lane - Battery StorageApproved, not yet built · 57 MW
Jan 20254.2 km away
Road and street works within 1 km
3 permitted works running now or planned, 2 of them major.
- Major
Nod Rise, CoventryUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Nov 2026 to Nov 2026
250 m away - Major, planned
Beech Tree Avenue, CoventryUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Jan 2027 to Jan 2027
950 m away - Minor
Nod Rise, CoventryRemedial works · CADENT GAS LIMITED · Give and take
Nov 2026 to Nov 2026
250 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Feb 2026
9.1 km away - Decideddecided May 2020
10.3 km away - Decideddecided Mar 2025
22.9 km away - Decideddecided Jul 2014
27.3 km away - Decideddecided Oct 2013
28.1 km away - Pre-application
Daventry International Rail Freight Terminal Phase 4 (DIRFT 4)Storage or Distribution of Goods · The site extends to approximately 255 hectares and lies wholly within the administrative area of West Northamptonshire, c. 7km east of Rugby and c.11.5km north of Daventry. The M1 runs immediately adjacent to the western boundary of the Site, and it is located c.1km to the north of Junction 18 of the M1. DIRFT III (the latest phase of development at DIRFT) is located immediately west of the site across the M1 motorway. The site is c.1.3km to the north of the village of Crick and c.800m to west of the village of Yelvertoft.
Transport schemes within 20 km
Running nearest: Coventry (energy from waste, 5.5 km); Coventry National Grid Substation (battery storage, 8.5 km); Land South of Pogmore Spinney (solar farm, 9.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.