320 new homes completed within 2 km, last 2 years
2 homes given permission on brownfield sites since 2021
+5.8% like-for-like prices in Eastern Green & Tanyard Farm, 2024 → 2025 (council +2.5%)
+6% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 32 new homes completed houses · Jun 2025 – Sep 2026
Sept 2026 550 m away New homes 31 new homes completed houses · Sep 2025 – Sep 2026
Sept 2026 550 m away New homes 15 new homes completed houses · Apr 2025 – Sep 2026
Sept 2026 1.5 km away New homes 13 new homes completed houses · May 2026 – Sep 2026
Sept 2026 1.0 km away New homes 16 new homes completed 2 flats, 14 houses · Jun 2026 – Sep 2026
Sept 2026 1.1 km away New homes 16 new homes completed houses · Mar 2026 – Jun 2026
Jun 2026 500 m away New homes 6 new homes completed houses · May 2026
May 2026 1.1 km away New homes 29 new homes completed houses · Jan 2025 – May 2026
May 2026 1.2 km away New homes 15 new homes completed houses · Dec 2024 – May 2026
May 2026 1.2 km away New homes 81 new homes completed 19 flats, 62 houses · Dec 2024 – Apr 2026
Apr 2026 1.5 km away New homes 21 new homes completed houses · Feb 2026 – Apr 2026
Apr 2026 600 m away New homes 7 new homes completed houses · Sep 2025 – Dec 2025
Dec 2025 1.3 km away 14 homes extended 2021–2025, typically adding 27 m²
25 since energy certificates began (2008)
0 in CV5 7FT itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
7 hours of spills in 2025 between them (typical neighbourhood: about 36)
4 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 48 planned, approved or being built and 4 running (68 MW between them). Those within 5 km are on the map above.
Battery storage Tanners Lane - Battery Energy Storage System Approved, not yet built · 30 MW
Jun 2025 1.9 km away Battery storage Hill House Farm, Coventry Road - Battery Energy Storage System Planning application in · 20 MW
Apr 2025 1.9 km away Battery storage Benton Green Lane - Battery Energy Storage System Planning application in · 70 MW
Jun 2025 2.2 km away Rooftop solar Automotive Trim Developments, Priory Mill - Solar Panels Approved, not yet built · 420 kW
Jun 2024 2.9 km away Battery storage Torrington Avenue Battery Storage Facility Approved, not yet built · 30 MW
Apr 2024 3.0 km away Battery storage Beechwood Farm, Hodgetts Lane - Battery Storage Approved, not yet built · 57 MW
Jan 2025 3.4 km away Battery storage Beechwood Farm, Hodgetts Lane - Battery Storage Planning application in · 57 MW
Jul 2024 3.4 km away Battery storage Hodgetts Lane, Berkswell - Electricity Storage Facility Planning application in · 50 MW
Jul 2023 3.4 km away Battery storage Hodgetts Lane, Berkswell - Electricity Storage Facility Approved, not yet built · 50 MW
Jan 2025 3.7 km away Battery storage Hodgetts Lane, Berkswell - Electricity Storage Facility Planning application in · 50 MW
Jul 2024 3.7 km away Road and street works within 1 km No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2020 8.1 km away Decided decided Feb 2026 11.2 km away Decided decided Mar 2025 23.9 km away Decided decided Oct 2013 26.3 km away Decided decided Jul 2014 29.5 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km Running nearest: Coventry (energy from waste, 7.7 km); Packington Generation Plant Phase 3 (landfill gas, 8.4 km); Land South of Pogmore Spinney (solar farm, 8.9 km); Coventry National Grid Substation (battery storage, 9.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.