Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
16hours of spills in 2025 between them (typical neighbourhood: about 36)
21spill events counted
Severn Trent Water
Eastern Green - Unicorn Lane Csointo Brookstray4 spills, 7 hours in 2025
2.0 km away
Severn Trent Water
Brookside Avenue Csointo Brookstray3 spills, 4 hours in 2025
750 m away
Severn Trent Water
Allesley Foul Sewer - Storm O/Finto River Sherbourne11 spills, 3 hours in 2025
1.6 km away
Severn Trent Water
Coventry - Maudslay Road (Cso)into Trib Of River Sherbourne3 spills, 1 hours in 2025
900 m away
Severn Trent Water
Earlsdon - Albany Road (Cso)into River Sherbourne0 spills, 0 hours in 2025
Daventry International Rail Freight Terminal Phase 4 (DIRFT 4)Storage or Distribution of Goods · The site extends to approximately 255 hectares and lies wholly within the administrative area of West Northamptonshire, c. 7km east of Rugby and c.11.5km north of Daventry. The M1 runs immediately adjacent to the western boundary of the Site, and it is located c.1km to the north of Junction 18 of the M1. DIRFT III (the latest phase of development at DIRFT) is located immediately west of the site across the M1 motorway. The site is c.1.3km to the north of the village of Crick and c.800m to west of the village of Yelvertoft.
New-home postcodes with fewer than 5 homes are counted above but not listed. 12 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Brose, Courtaulds Way - Solar PanelsApproved, not yet built · 400 kW
Nov 2024 3.9 km away
Battery storage
Hodgetts Lane, Berkswell - Electricity Storage FacilityApproved, not yet built · 50 MW
Jan 2025 4.6 km away
Running nearest: Coventry (energy from waste, 4.1 km); Coventry National Grid Substation (battery storage, 8.0 km); Waverley Wood II (landfill gas, 9.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Railways · Between Redditch and Alvechurch
decided Oct 2013 29.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.