Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
8hours of spills in 2025 between them (typical neighbourhood: about 36)
17spill events counted
Severn Trent Water
Brookside Avenue Csointo Brookstray3 spills, 4 hours in 2025
1.5 km away
Severn Trent Water
Allesley Foul Sewer - Storm O/Finto River Sherbourne11 spills, 3 hours in 2025
250 m away
Severn Trent Water
Coventry - Maudslay Road (Cso)into Trib Of River Sherbourne3 spills, 1 hours in 2025
1.1 km away
Severn Trent Water
Earlsdon - Albany Road (Cso)into River Sherbourne0 spills, 0 hours in 2025
450 m away
Severn Trent Water
Meadow Street Csointo River Sherbourne0 spills, 0 hours in 2025
Daventry International Rail Freight Terminal Phase 4 (DIRFT 4)Storage or Distribution of Goods · The site extends to approximately 255 hectares and lies wholly within the administrative area of West Northamptonshire, c. 7km east of Rugby and c.11.5km north of Daventry. The M1 runs immediately adjacent to the western boundary of the Site, and it is located c.1km to the north of Junction 18 of the M1. DIRFT III (the latest phase of development at DIRFT) is located immediately west of the site across the M1 motorway. The site is c.1.3km to the north of the village of Crick and c.800m to west of the village of Yelvertoft.
New-home postcodes with fewer than 5 homes are counted above but not listed. 19 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Alan Higgs Centre, Allard Way - Solar PanelsApproved, not yet built · 430 kW
Dec 2024 3.9 km away
Rooftop solar
Coventry Sports Foundation, Bell Green Road - Solar PanelsApproved, not yet built · 170 kW
Jan 2025 4.0 km away
Running nearest: Coventry (energy from waste, 2.8 km); Coventry National Grid Substation (battery storage, 6.8 km); Waverley Wood II (landfill gas, 8.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Standard
Albany Road, CoventryHighway improvement works · COVENTRY CITY COUNCIL · Multi-way signals
Oct 2026 to Oct 2026 500 m away
Standard
Broomfield Road, CoventryUtility repair and maintenance works · SEVERN TRENT WATER · Multi-way signals
Oct 2026 to Oct 2026 500 m away
Standard
Holyhead Road, CoventryNew service connection · UK POWER DISTRIBUTION LTD · Multi-way signals
Oct 2026 to Nov 2026 500 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Transfer of Water Resources · The project is linear in nature and extends to approximately 160km. From north to south, the project starts at the Minworth Wastewater Recycling Centre north-east of Birmingham. Thereafter water will be transferred eastwards to the Coventry Canal at Atherstone. From the Coventry Canal, the site of the project extends in a south-easterly direction connecting to the Oxford Canal followed by the Grand Union Canal. Water will then be abstracted and treated south of Milton Keynes before being transferred to an existing water supply reservoir near Luton.
application due July 2027 29.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.