Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
13hours of spills in 2025 between them (typical neighbourhood: about 36)
11spill events counted
Severn Trent Water
Eastern Green - Unicorn Lane Csointo Brookstray4 spills, 7 hours in 2025
1.2 km away
Severn Trent Water
Brookside Avenue Csointo Brookstray3 spills, 4 hours in 2025
1.4 km away
Severn Trent Water
Coventry - Maudslay Road (Cso)into Trib Of River Sherbourne3 spills, 1 hours in 2025
Daventry International Rail Freight Terminal Phase 4 (DIRFT 4)Storage or Distribution of Goods · The site extends to approximately 255 hectares and lies wholly within the administrative area of West Northamptonshire, c. 7km east of Rugby and c.11.5km north of Daventry. The M1 runs immediately adjacent to the western boundary of the Site, and it is located c.1km to the north of Junction 18 of the M1. DIRFT III (the latest phase of development at DIRFT) is located immediately west of the site across the M1 motorway. The site is c.1.3km to the north of the village of Crick and c.800m to west of the village of Yelvertoft.
Transport schemes within 20 km
Transport
HS2: Interchange station (Solihull)Under construction, near the NEC and Birmingham Airport
under construction 11.4 km away
The longer view
Like-for-like prices in Earl Place & Lime Tree Park: +21% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): -2.8% in two years.
Hill House Farm, Coventry Road - Battery Energy Storage SystemPlanning application in · 20 MW
Apr 2025 4.0 km away
Rooftop solar
Manor Park Primary School, Ulverscroft Road - Solar PanelsPlanning application in · 250 kW
May 2026 4.3 km away
Running nearest: Coventry (energy from waste, 5.3 km); Coventry National Grid Substation (battery storage, 8.9 km); Waverley Wood II (landfill gas, 9.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
application due November 2027 28.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.