What's changing near CV3 5HU
Within 2 km, around Cheylesmore Daventry Road in Coventry. Building, planning, schools, transport, prices and crime.
130new homes completed within 2 km, last 2 years
3,029homes given permission on brownfield sites since 2021
-0.6%like-for-like prices in Cheylesmore Daventry Road, 2024 → 2025 (council +2.5%)
-1%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedSchool closedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
13 new homes completed1 flats, 12 houses · Nov 2025 – Sep 2026
Sept 2026
1.5 km away - New homes
29 new homes completedhouses · Oct 2025 – Sep 2026
Sept 2026
1.9 km away - New homes
14 new homes completedhouses · Jan 2026 – Jul 2026
Jul 2026
1.8 km away - New homes
20 new homes completedflats · Mar 2026
Mar 2026
1.4 km away - New homes
17 new homes completedhouses · Oct 2025 – Dec 2025
Dec 2025
2.0 km away - Planning permissionAug 2025
1.7 km away - New homes
5 new homes completedflats · Jan 2025 – Feb 2025
Feb 2025
1.8 km away - New schoolDec 2024
1.9 km away - School closed
School closed: Summit SchoolOther independent special school, other independent special school (closure)
Nov 2024
2.0 km away - Planning permission
17homes extended 2021–2025, typically adding 23 m²
37since energy certificates began (2008)
2in CV3 5HU itself
- Extendedcertificate 2021
- Extendedcertificate 2016
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
51 planned, approved or being built and 3 running (57 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Manor Park Primary School, Ulverscroft Road - Solar PanelsPlanning application in · 250 kW
May 2026
550 m away - Rooftop solar
Coventry University - Solar PanelsApproved, not yet built
Nov 2024
1.4 km away - Rooftop solar
Coventry University, Decarbonisation Scheme - The HubApproved, not yet built
Nov 2024
1.4 km away - Rooftop solar
Alan Higgs Centre, Allard Way - Solar PanelsApproved, not yet built · 430 kW
Dec 2024
1.8 km away - Rooftop solar
Cycle Works Building - Solar PanelsApproved, not yet built
Nov 2024
2.0 km away - Rooftop solar
Sky Dome - Solar PhotovoltaicsApproved, not yet built · 420 kW
Jul 2021
2.1 km away - Rooftop solar
Sidney Stringer Academy, Primrose Hill Street - Solar PanelsApproved, not yet built · 200 kW
Sept 2025
2.3 km away - Rooftop solar
UKBIC, Rowley Road - Solar PanelsPlanning application in
Aug 2023
2.3 km away - Rooftop solar
City College, Swanswell Street - Solar PanelsApproved, not yet built · 460 kW
Sept 2025
2.4 km away - Rooftop solar
Ree Automotive Uk, Siskin Drive - Solar PanelsApproved, not yet built · 570 kW
Apr 2025
3.2 km away - Rooftop solar
Road and street works within 1 km
2 permitted works running now or planned, 2 of them major.
- Major
Woodstock Road, CoventryHighway improvement works · COVENTRY CITY COUNCIL · Road closure
Nov 2026 to Nov 2026
150 m away - Major, planned
Cascade Close, CoventryHighway improvement works · COVENTRY CITY COUNCIL · Road closure
Dec 2026 to Dec 2026
650 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Feb 2026
5.1 km away - Decideddecided May 2020
15.3 km away - Decideddecided Mar 2025
21.4 km away - Decideddecided Jul 2014
22.5 km away - Pre-application
Daventry International Rail Freight Terminal Phase 4 (DIRFT 4)Storage or Distribution of Goods · The site extends to approximately 255 hectares and lies wholly within the administrative area of West Northamptonshire, c. 7km east of Rugby and c.11.5km north of Daventry. The M1 runs immediately adjacent to the western boundary of the Site, and it is located c.1km to the north of Junction 18 of the M1. DIRFT III (the latest phase of development at DIRFT) is located immediately west of the site across the M1 motorway. The site is c.1.3km to the north of the village of Crick and c.800m to west of the village of Yelvertoft. application due November 2027
23.5 km away - Pre-application
Transport schemes within 20 km
Running nearest: Coventry (energy from waste, 800 m); Waverley Wood II (landfill gas, 6.2 km); Coventry National Grid Substation (battery storage, 7.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.