Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
0hours of spills in 2025 between them (typical neighbourhood: about 36)
0spill events counted
Severn Trent Water
Meadow Street Csointo River Sherbourne0 spills, 0 hours in 2025
Daventry International Rail Freight Terminal Phase 4 (DIRFT 4)Storage or Distribution of Goods · The site extends to approximately 255 hectares and lies wholly within the administrative area of West Northamptonshire, c. 7km east of Rugby and c.11.5km north of Daventry. The M1 runs immediately adjacent to the western boundary of the Site, and it is located c.1km to the north of Junction 18 of the M1. DIRFT III (the latest phase of development at DIRFT) is located immediately west of the site across the M1 motorway. The site is c.1.3km to the north of the village of Crick and c.800m to west of the village of Yelvertoft.
New school: Summit SchoolOther independent special school, other independent special school
Dec 2020 1.8 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 26 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Ree Automotive Uk, Siskin Drive - Solar PanelsApproved, not yet built · 570 kW
Apr 2025 3.3 km away
Rooftop solar
Brose, Courtaulds Way - Solar PanelsApproved, not yet built · 400 kW
Nov 2024 3.4 km away
Running nearest: Coventry (energy from waste, 700 m); Waverley Wood II (landfill gas, 6.4 km); Coventry National Grid Substation (battery storage, 7.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Transfer of Water Resources · The project is linear in nature and extends to approximately 160km. From north to south, the project starts at the Minworth Wastewater Recycling Centre north-east of Birmingham. Thereafter water will be transferred eastwards to the Coventry Canal at Atherstone. From the Coventry Canal, the site of the project extends in a south-easterly direction connecting to the Oxford Canal followed by the Grand Union Canal. Water will then be abstracted and treated south of Milton Keynes before being transferred to an existing water supply reservoir near Luton.
application due July 2027 27.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.