Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
106hours of spills in 2025 between them (typical neighbourhood: about 36)
32spill events counted
Severn Trent Water
Moreton Paddox Stwinto Tributary Of River Avon24 spills, 67 hours in 2025
1.9 km away
Severn Trent Water
Moreton Morrell Wwtwinto Charlecote Brook8 spills, 39 hours in 2025
23 planned, approved or being built and 11 running (132 MW between them). Those within 5 km are on the map above.
Solar farm
Moreton Morrell - Solar PVApproved, not yet built · 20 MW
Jul 2025 700 m away
Solar farm
British Film Institute - Solar ArraysApproved, not yet built · 160 kW
Dec 2021 2.3 km away
Rooftop solar
Guide Dogs National Breeding Centre, Banbury Road - Solar PV PanelsApproved, not yet built · 390 kW
Sept 2023 3.6 km away
Rooftop solar
Aston Martin Lagonda, Banbury Road - Solar panelsApproved, not yet built · 5 MW
Oct 2024 4.2 km away
Solar farm
Ashorne Hill - Solar FarmApproved, not yet built · 50 MW
Aug 2022 4.3 km away
Battery storage
Ashorne Hill - Solar FarmApproved, not yet built
Jun 2024 4.3 km away
Rooftop solar
Barnwell Poultry Farm, Harbury Lane - Solar PanelsApproved, not yet built · 150 kW
Jan 2025 6.3 km away
Rooftop solar
Gaydon Road, Bishops Itchington - Solar Photovoltaic PanelsApproved, not yet built · 210 kW
Apr 2022 7.3 km away
Solar farm
Middle Road Farm - Solar Farm & Battery StorageApproved, not yet built · 50 MW
Aug 2023 7.4 km away
Battery storage
Middle Road Farm - Solar Farm & Battery StorageApproved, not yet built
Aug 2023 7.4 km away
Solar farm
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
Arrow Valley SolarGenerating Stations · approximately 4km south west of Alcester within the administrative area of Wychavon District Council, Stratford-on-Avon District Council and Redditch Borough Council.
The Grand Union Canal TransferTransfer of Water Resources · The project is linear in nature and extends to approximately 160km. From north to south, the project starts at the Minworth Wastewater Recycling Centre north-east of Birmingham. Thereafter water will be transferred eastwards to the Coventry Canal at Atherstone. From the Coventry Canal, the site of the project extends in a south-easterly direction connecting to the Oxford Canal followed by the Grand Union Canal. Water will then be abstracted and treated south of Milton Keynes before being transferred to an existing water supply reservoir near Luton.
application due July 2027 28.8 km away
Decided
M42 Junction 6 ImprovementHighways · Junction 6 of the M42 motorway, close to the National Exhibition Centre (NEC)
decided May 2020 29.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Wellesbourne & Snitterfield: +24% over five years (2020 → 2025).
Council tax list: 20 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.7% in two years.