Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
16 planned, approved or being built and 10 running (134 MW between them). Those within 5 km are on the map above.
Rooftop solar
Aston Martin Lagonda, Banbury Road - Solar panelsApproved, not yet built · 5 MW
Oct 2024 1.8 km away
Solar farm
Feldon Vale Solar FarmApproved, not yet built · 50 MW
Dec 2022 3.0 km away
Rooftop solar
Gaydon Road, Bishops Itchington - Solar Photovoltaic PanelsApproved, not yet built · 210 kW
Apr 2022 3.5 km away
Solar farm
British Film Institute - Solar ArraysApproved, not yet built · 160 kW
Dec 2021 3.8 km away
Solar farm
Moreton Morrell - Solar PVApproved, not yet built · 20 MW
Jul 2025 4.9 km away
Battery storage
Bishops Bowl Fishery - Battery Energy StorageApproved, not yet built
Oct 2023 5.8 km away
Solar farm
Ashorne Hill - Solar FarmApproved, not yet built · 50 MW
Aug 2022 6.0 km away
Battery storage
Ashorne Hill - Solar FarmApproved, not yet built
Jun 2024 6.0 km away
Solar farm
Eastfields Farm, Deppers Bridge - Solar FarmBeing built · 35 MW
Nov 2023 6.7 km away
Anaerobic digestion
Tubbs End, Tysoe Road - Anaerobic Digestion FacilityPlanning application in
Oct 2022 6.8 km away
Battery storage
Eastfields Farm, Harbury - Battery Storage
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-application
The Grand Union Canal TransferTransfer of Water Resources · The project is linear in nature and extends to approximately 160km. From north to south, the project starts at the Minworth Wastewater Recycling Centre north-east of Birmingham. Thereafter water will be transferred eastwards to the Coventry Canal at Atherstone. From the Coventry Canal, the site of the project extends in a south-easterly direction connecting to the Oxford Canal followed by the Grand Union Canal. Water will then be abstracted and treated south of Milton Keynes before being transferred to an existing water supply reservoir near Luton.
Arrow Valley SolarGenerating Stations · approximately 4km south west of Alcester within the administrative area of Wychavon District Council, Stratford-on-Avon District Council and Redditch Borough Council.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Kineton, Tysoe & Warmington: +16% over five years (2020 → 2025).
Council tax list: 20 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.4% in two years.