M42 Junction 6 ImprovementHighways · Junction 6 of the M42 motorway, close to the National Exhibition Centre (NEC)
decided May 2020 23.4 km away
Pre-application
Arrow Valley SolarGenerating Stations · approximately 4km south west of Alcester within the administrative area of Wychavon District Council, Stratford-on-Avon District Council and Redditch Borough Council.
application due April 2027 26.0 km away
Pre-application
The Grand Union Canal TransferTransfer of Water Resources · The project is linear in nature and extends to approximately 160km. From north to south, the project starts at the Minworth Wastewater Recycling Centre north-east of Birmingham. Thereafter water will be transferred eastwards to the Coventry Canal at Atherstone. From the Coventry Canal, the site of the project extends in a south-easterly direction connecting to the Oxford Canal followed by the Grand Union Canal. Water will then be abstracted and treated south of Milton Keynes before being transferred to an existing water supply reservoir near Luton.
New-home postcodes with fewer than 5 homes are counted above but not listed. 35 postcodes nearby had new homes completed in the last two years.
Rooftop solar
Sodick Europe Limited, Agincourt Road - Solar PanelsApproved, not yet built · 210 kW
Dec 2023 4.7 km away
Solar farm
Sherbourne Warwick Solar (Hampton Lodge)Approved, not yet built · 20 MW
Sept 2023 6.1 km away
Running nearest: Wolseley National Distribution Centre (rooftop solar, 1.2 km); Brickyard Barn (solar farm, 1.8 km); Tollgate Farm (solar farm, 3.2 km); Land On The East Side Of Fosse Way (solar farm, 4.1 km); Newbold Pacey Solar Farm (solar farm, 6.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Storage or Distribution of Goods · The site extends to approximately 255 hectares and lies wholly within the administrative area of West Northamptonshire, c. 7km east of Rugby and c.11.5km north of Daventry. The M1 runs immediately adjacent to the western boundary of the Site, and it is located c.1km to the north of Junction 18 of the M1. DIRFT III (the latest phase of development at DIRFT) is located immediately west of the site across the M1 motorway. The site is c.1.3km to the north of the village of Crick and c.800m to west of the village of Yelvertoft.
application due November 2027 29.0 km away