What's changing near CV34 6AQ
Within 2 km, around Warwick South East, Myton & Heathcote in Warwick. Building, planning, schools, transport, prices and crime.
40new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+0.9%like-for-like prices in Warwick South East, Myton & Heathcote, 2024 → 2025 (council +2.1%)
+1%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
7 new homes completedhouses · Feb 2026 – Aug 2026
Aug 2026
1.7 km away - New homes
8 new homes completedhouses · Jan 2026 – Apr 2026
Apr 2026
1.8 km away - New homes
9 new homes completedhouses · Nov 2024 – Dec 2024
Dec 2024
1.9 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 9 postcodes nearby had new homes completed in the last two years.
5homes extended 2021–2025, typically adding 25 m²
11since energy certificates began (2008)
0in CV34 6AQ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
215hours of spills in 2025 between them (typical neighbourhood: about 36)
29spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
16 planned, approved or being built and 5 running (49 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Leisure Centre, St Nicholas Park - Solar PanelsApproved, not yet built · 210 kW
Apr 2025
1.0 km away - Rooftop solar
Sodick Europe Limited, Agincourt Road - Solar PanelsApproved, not yet built · 210 kW
Dec 2023
1.9 km away - Rooftop solar
Sainsburys Supermarket, Tachbrook Park Drive - Solar PanelsApproved, not yet built · 610 kW
Sept 2025
3.0 km away - Solar farm
Sherbourne Warwick Solar (Hampton Lodge)Approved, not yet built · 20 MW
Sept 2023
3.3 km away - Solar farm
Sherbourne - Solar FarmApproved, not yet built · 25 MW
Aug 2023
4.6 km away - Battery storage
Sherbourne - Solar FarmApproved, not yet built
Aug 2023
4.6 km away - Rooftop solar
Unit 12, Sydenham Industrial Estate - Solar PanelsApproved, not yet built · 260 kW
Jul 2022
4.9 km away - Rooftop solar
Barnwell Poultry Farm, Harbury Lane - Solar PanelsApproved, not yet built · 150 kW
Jan 2025
5.0 km away - Rooftop solar
Newbold Comyn Leisure Centre, Newbold Terrace East - Solar PanelsApproved, not yet built · 170 kW
Nov 2024
5.2 km away - Rooftop solar
Guide Dogs National Breeding Centre, Banbury Road - Solar PV PanelsApproved, not yet built · 390 kW
Sept 2023
5.9 km away
Road and street works within 1 km
4 permitted works running now or planned, 3 of them major.
- Major
Temple Grove, WarwickHighway improvement works · WARWICKSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
400 m away - Major
Theatre Street, WarwickHighway improvement works · WARWICKSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
450 m away - Major
Foxes Way, WarwickUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Nov 2026 to Nov 2026
650 m away - Minor
Stratford Road, WarwickHighway improvement works · WARWICKSHIRE COUNTY COUNCIL · Two-way signals
Dec 2026 to Dec 2026
400 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Feb 2026
18.5 km away - Decideddecided May 2020
20.3 km away - Pre-application
Arrow Valley SolarGenerating Stations · approximately 4km south west of Alcester within the administrative area of Wychavon District Council, Stratford-on-Avon District Council and Redditch Borough Council. application due April 2027
23.3 km away - Decideddecided Oct 2013
27.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Brickyard Barn (solar farm, 3.8 km); Wolseley National Distribution Centre (rooftop solar, 3.9 km); Tollgate Farm (solar farm, 5.7 km); Newbold Pacey Solar Farm (solar farm, 7.5 km); Land On The East Side Of Fosse Way (solar farm, 8.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.