Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
M42 Junction 6 ImprovementHighways · Junction 6 of the M42 motorway, close to the National Exhibition Centre (NEC)
decided May 2020 19.2 km away
Pre-application
Arrow Valley SolarGenerating Stations · approximately 4km south west of Alcester within the administrative area of Wychavon District Council, Stratford-on-Avon District Council and Redditch Borough Council.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Warwick South West & Aylesford: +15% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.8% in two years.
Guide Dogs National Breeding Centre, Banbury Road - Solar PV PanelsApproved, not yet built · 390 kW
Sept 2023 6.9 km away
Solar farm
Ashorne Hill - Solar FarmApproved, not yet built · 50 MW
Aug 2022 8.6 km away
Running nearest: Wolseley National Distribution Centre (rooftop solar, 4.2 km); Brickyard Barn (solar farm, 4.9 km); Tollgate Farm (solar farm, 6.8 km); Land On The East Side Of Fosse Way (solar farm, 8.5 km); Newbold Pacey Solar Farm (solar farm, 8.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.