What's changing near CV32 7JZ
Within 2 km, around Cubbington, Stoneleigh & Radford Semele in Warwick. Building, planning, schools, transport, prices and crime.
1new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-0.5%like-for-like prices in Cubbington, Stoneleigh & Radford Semele, 2024 → 2025 (council +2.1%)
+55%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 1 postcodes nearby had new homes completed in the last two years.
9homes extended 2021–2025, typically adding 38 m²
19since energy certificates began (2008)
0in CV32 7JZ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
90hours of spills in 2025 between them (typical neighbourhood: about 36)
15spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
22 planned, approved or being built and 8 running (33 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Newbold Comyn Leisure Centre, Newbold Terrace East - Solar PanelsApproved, not yet built · 170 kW
Nov 2024
2.9 km away - Rooftop solar
Unit 12, Sydenham Industrial Estate - Solar PanelsApproved, not yet built · 260 kW
Jul 2022
4.2 km away - Solar farm
Leamington Road, Princethorpe - Ash Tree Solar Photovoltaic ArraysApproved, not yet built · 17 MW
Aug 2025
4.7 km away - Rooftop solar
Sainsburys Supermarket, Tachbrook Park Drive - Solar PanelsApproved, not yet built · 610 kW
Sept 2025
5.1 km away - Rooftop solar
Canute Haulage Group, Siskin Parkway East - Solar PanelsApproved, not yet built · 170 kW
Jun 2024
6.1 km away - Rooftop solar
Siskin Parkway East, Middlemarch Business Park - Solar PanelsApproved, not yet built · 270 kW
Feb 2023
6.2 km away - Rooftop solar
Leisure Centre, St Nicholas Park - Solar PanelsApproved, not yet built · 210 kW
Apr 2025
6.6 km away - Rooftop solar
Barnwell Poultry Farm, Harbury Lane - Solar PanelsApproved, not yet built · 150 kW
Jan 2025
6.6 km away - Rooftop solar
UKBIC, Rowley Road - Solar PanelsPlanning application in
Aug 2023
6.7 km away - Rooftop solar
Castle Farm Recreation Ground, Fishponds Road - Solar panelsApproved, not yet built
Road and street works within 1 km
2 permitted works running now or planned, 1 of them major.
- Major, planned
Church Lane, CubbingtonHighway improvement works · WARWICKSHIRE COUNTY COUNCIL · Road closure
Dec 2026 to Dec 2026
50 m away - HS2 (Highway)
Rugby Road, CubbingtonWorks for Rail Purposes · HS2 LTD · Road closure
Oct 2026 to Oct 2026
650 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Feb 2026
12.0 km away - Decideddecided May 2020
20.7 km away - Decideddecided Jul 2014
23.0 km away - Pre-application
Daventry International Rail Freight Terminal Phase 4 (DIRFT 4)Storage or Distribution of Goods · The site extends to approximately 255 hectares and lies wholly within the administrative area of West Northamptonshire, c. 7km east of Rugby and c.11.5km north of Daventry. The M1 runs immediately adjacent to the western boundary of the Site, and it is located c.1km to the north of Junction 18 of the M1. DIRFT III (the latest phase of development at DIRFT) is located immediately west of the site across the M1 motorway. The site is c.1.3km to the north of the village of Crick and c.800m to west of the village of Yelvertoft. application due November 2027
24.2 km away - Pre-application
The Grand Union Canal TransferTransfer of Water Resources · The project is linear in nature and extends to approximately 160km. From north to south, the project starts at the Minworth Wastewater Recycling Centre north-east of Birmingham. Thereafter water will be transferred eastwards to the Coventry Canal at Atherstone. From the Coventry Canal, the site of the project extends in a south-easterly direction connecting to the Oxford Canal followed by the Grand Union Canal. Water will then be abstracted and treated south of Milton Keynes before being transferred to an existing water supply reservoir near Luton.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Waverley Wood II (landfill gas, 3.5 km); Wolseley National Distribution Centre (rooftop solar, 5.0 km); Land On The East Side Of Fosse Way (solar farm, 6.6 km); Brickyard Barn (solar farm, 7.9 km); Ufton (landfill gas, 8.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.