What's changing near CV31 3NE
Within 2 km, around Leamington West & Milverton in Warwick. Building, planning, schools, transport, prices and crime.
72new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-1.7%like-for-like prices in Leamington West & Milverton, 2024 → 2025 (council +2.1%)
-6%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
6 new homes completedflats · Jun 2026
Jun 2026
850 m away - New homes
8 new homes completedflats · Jun 2025
Jun 2025
850 m away - New homes
10 new homes completedflats · Apr 2025
Apr 2025
1.9 km away - New homes
13 new homes completedhouses · Nov 2024 – Mar 2025
Mar 2025
1.9 km away - New homes
8 new homes completedflats · Mar 2025
Mar 2025
700 m away - New schoolJan 2021
750 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 21 postcodes nearby had new homes completed in the last two years.
18homes extended 2021–2025, typically adding 32 m²
47since energy certificates began (2008)
1in CV31 3NE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
8storm overflows within 2 km
207hours of spills in 2025 between them (typical neighbourhood: about 36)
85spill events counted
- Severn Trent Water
Princes Drive Cso 19ainto River Leam13 spills, 47 hours in 2025
1.0 km away - Severn Trent Water
N Leamington Foul Sewer Cso 90into River Leam17 spills, 45 hours in 2025
1.0 km away - Severn Trent Water
Leamington Cso 50into River Leam26 spills, 43 hours in 2025
150 m away - Severn Trent Water
Leamington-Princes Drive Cso 19binto River Leam13 spills, 36 hours in 2025
1.0 km away - Severn Trent Water
Stamford Gardens Cso Overflow 20into River Leam4 spills, 22 hours in 2025
650 m away - Severn Trent Water
Bath Place Csointo River Leam12 spills, 13 hours in 2025
300 m away - Severn Trent Water
Leamington Sso 11 And 12into River Leam0 spills, 0 hours in 2025
250 m away - Severn Trent Water
Leamington - Gresham Av/Cromer Rd (Cso) into Lillington Brook0 spills, 0 hours in 2025
1.7 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
23 planned, approved or being built and 9 running (68 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Newbold Comyn Leisure Centre, Newbold Terrace East - Solar PanelsApproved, not yet built · 170 kW
Nov 2024
1.1 km away - Rooftop solar
Sainsburys Supermarket, Tachbrook Park Drive - Solar PanelsApproved, not yet built · 610 kW
Sept 2025
1.3 km away - Rooftop solar
Unit 12, Sydenham Industrial Estate - Solar PanelsApproved, not yet built · 260 kW
Jul 2022
1.4 km away - Rooftop solar
Leisure Centre, St Nicholas Park - Solar PanelsApproved, not yet built · 210 kW
Apr 2025
3.1 km away - Rooftop solar
Barnwell Poultry Farm, Harbury Lane - Solar PanelsApproved, not yet built · 150 kW
Jan 2025
3.4 km away - Solar farm
Middle Road Farm - Solar Farm & Battery StorageApproved, not yet built · 50 MW
Aug 2023
5.5 km away - Battery storage
Middle Road Farm - Solar Farm & Battery StorageApproved, not yet built
Aug 2023
5.5 km away - Rooftop solar
Sodick Europe Limited, Agincourt Road - Solar PanelsApproved, not yet built · 210 kW
Dec 2023
5.6 km away - Rooftop solar
Guide Dogs National Breeding Centre, Banbury Road - Solar PV PanelsApproved, not yet built · 390 kW
Sept 2023
6.1 km away - Solar farm
Ashorne Hill - Solar FarmApproved, not yet built · 50 MW
Aug 20226.4 km away
Road and street works within 1 km
16 permitted works running now or planned, 8 of them major.
- Major
Bedford Street, Leamington SpaRemedial works · National Grid Electricity Distribution (East Midlands) · Road closure
Jan 2027 to Jan 2027
550 m away - Major
Parade, Leamington SpaOptional permit (no fee) e.g. for traffic management etc · WARWICKSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
700 m away - Major, planned
England Crescent, Leamington SpaUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Dec 2026 to Dec 2026
700 m away - Major
England Crescent, Leamington SpaUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Dec 2026 to Dec 2026
700 m away - Major, planned
Queensway, Leamington SpaHighway improvement works · WARWICKSHIRE COUNTY COUNCIL · Road closure
Jan 2027 to Jan 2027
850 m away - Major
Queensway, Leamington SpaUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Sept 2026 to Oct 2026
900 m away - Major, planned
Hyde Place, Leamington SpaHighway improvement works · WARWICKSHIRE COUNTY COUNCIL · Road closure
Dec 2026 to Dec 2026
950 m away - Major, planned
Beauchamp Hill, Leamington SpaHighway improvement works · WARWICKSHIRE COUNTY COUNCIL · Road closure
Dec 2026 to Dec 2026
1000 m away - Standard
Queensway, Leamington SpaUtility asset works · CADENT GAS LIMITED · Multi-way signals
Oct 2026 to Oct 2026900 m away
Major infrastructure projects within 30 km
- Decideddecided Feb 2026
15.7 km away - Decideddecided May 2020
21.4 km away - Decideddecided Jul 2014
26.4 km away - Pre-application
The Grand Union Canal TransferTransfer of Water Resources · The project is linear in nature and extends to approximately 160km. From north to south, the project starts at the Minworth Wastewater Recycling Centre north-east of Birmingham. Thereafter water will be transferred eastwards to the Coventry Canal at Atherstone. From the Coventry Canal, the site of the project extends in a south-easterly direction connecting to the Oxford Canal followed by the Grand Union Canal. Water will then be abstracted and treated south of Milton Keynes before being transferred to an existing water supply reservoir near Luton. application due July 2027
26.7 km away - Pre-application
Arrow Valley SolarGenerating Stations · approximately 4km south west of Alcester within the administrative area of Wychavon District Council, Stratford-on-Avon District Council and Redditch Borough Council. application due April 2027
27.3 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Wolseley National Distribution Centre (rooftop solar, 1.4 km); Brickyard Barn (solar farm, 4.2 km); Land On The East Side Of Fosse Way (solar farm, 5.1 km); Tollgate Farm (solar farm, 5.7 km); Waverley Wood II (landfill gas, 7.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.