What's changing near CV31 2LJ
Within 2 km, around Whitnash in Warwick. Building, planning, schools, transport, prices and crime.
65new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+7.6%like-for-like prices in Whitnash, 2024 → 2025 (council +2.1%)
-2%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
9 new homes completedhouses · Jun 2026 – Oct 2026
Oct 2026
1.2 km away - New homes
16 new homes completedhouses · Feb 2026 – Sep 2026
Sept 2026
850 m away - New homes
19 new homes completedhouses · Jun 2026 – Sep 2026
Sept 2026
800 m away - New homes
6 new homes completedhouses · Jun 2026 – Jul 2026
Jul 2026
800 m away - New homes
7 new homes completedhouses · Dec 2025
Dec 2025
900 m away - New schoolJan 2021
1.7 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 9 postcodes nearby had new homes completed in the last two years.
28homes extended 2021–2025, typically adding 26 m²
46since energy certificates began (2008)
1in CV31 2LJ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
25 planned, approved or being built and 12 running (138 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Barnwell Poultry Farm, Harbury Lane - Solar PanelsApproved, not yet built · 150 kW
Jan 2025
950 m away - Rooftop solar
Unit 12, Sydenham Industrial Estate - Solar PanelsApproved, not yet built · 260 kW
Jul 2022
1.5 km away - Rooftop solar
Sainsburys Supermarket, Tachbrook Park Drive - Solar PanelsApproved, not yet built · 610 kW
Sept 2025
2.1 km away - Rooftop solar
Newbold Comyn Leisure Centre, Newbold Terrace East - Solar PanelsApproved, not yet built · 170 kW
Nov 2024
2.9 km away - Solar farm
Middle Road Farm - Solar Farm & Battery StorageApproved, not yet built · 50 MW
Aug 2023
3.8 km away - Battery storage
Middle Road Farm - Solar Farm & Battery StorageApproved, not yet built
Aug 2023
3.8 km away - Rooftop solar
Guide Dogs National Breeding Centre, Banbury Road - Solar PV PanelsApproved, not yet built · 390 kW
Sept 2023
3.8 km away - Solar farm
Ashorne Hill - Solar FarmApproved, not yet built · 50 MW
Aug 2022
4.0 km away - Battery storage
Ashorne Hill - Solar FarmApproved, not yet built
Jun 2024
4.0 km away - Rooftop solar
Leisure Centre, St Nicholas Park - Solar PanelsApproved, not yet built · 210 kW
Apr 2025
4.0 km away
Road and street works within 1 km
2 permitted works running now or planned, 1 of them major.
- Major
Othello Avenue, WarwickUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Jan 2027 to Jan 2027
850 m away - Minor
Harbury Lane, Bishops TachbrookOptional permit (no fee) e.g. for traffic management etc · WARWICKSHIRE COUNTY COUNCIL · Multi-way signals
Oct 2026 to Oct 2026
650 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Feb 2026
17.7 km away - Decideddecided May 2020
23.6 km away - Pre-application
The Grand Union Canal TransferTransfer of Water Resources · The project is linear in nature and extends to approximately 160km. From north to south, the project starts at the Minworth Wastewater Recycling Centre north-east of Birmingham. Thereafter water will be transferred eastwards to the Coventry Canal at Atherstone. From the Coventry Canal, the site of the project extends in a south-easterly direction connecting to the Oxford Canal followed by the Grand Union Canal. Water will then be abstracted and treated south of Milton Keynes before being transferred to an existing water supply reservoir near Luton. application due July 2027
26.3 km away - Pre-application
Arrow Valley SolarGenerating Stations · approximately 4km south west of Alcester within the administrative area of Wychavon District Council, Stratford-on-Avon District Council and Redditch Borough Council. application due April 2027
26.7 km away - Decideddecided Jul 2014
27.0 km away - Pre-application
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Wolseley National Distribution Centre (rooftop solar, 1.2 km); Brickyard Barn (solar farm, 2.5 km); Land On The East Side Of Fosse Way (solar farm, 3.4 km); Tollgate Farm (solar farm, 3.5 km); Ufton (landfill gas, 6.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.