Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
213hours of spills in 2025 between them (typical neighbourhood: about 36)
35spill events counted
Severn Trent Water
Rugby Newbold Stwinto The River Avon17 spills, 138 hours in 2025
950 m away
Severn Trent Water
Rugby - Hunters Lane (Avon Mill) (Cso)into River Avon6 spills, 56 hours in 2025
1.1 km away
Severn Trent Water
Newbold-Avon Lane Csointo Trib Of River Avon11 spills, 19 hours in 2025
600 m away
Severn Trent Water
Rugby Newbold Stwinto The River Avon1 spills, 0 hours in 2025
950 m away
Severn Trent Water
Wood Street - Kimberley Road Csointo River Avon0 spills, 0 hours in 2025
Daventry International Rail Freight Terminal Phase 4 (DIRFT 4)Storage or Distribution of Goods · The site extends to approximately 255 hectares and lies wholly within the administrative area of West Northamptonshire, c. 7km east of Rugby and c.11.5km north of Daventry. The M1 runs immediately adjacent to the western boundary of the Site, and it is located c.1km to the north of Junction 18 of the M1. DIRFT III (the latest phase of development at DIRFT) is located immediately west of the site across the M1 motorway. The site is c.1.3km to the north of the village of Crick and c.800m to west of the village of Yelvertoft.
The Grand Union Canal TransferTransfer of Water Resources · The project is linear in nature and extends to approximately 160km. From north to south, the project starts at the Minworth Wastewater Recycling Centre north-east of Birmingham. Thereafter water will be transferred eastwards to the Coventry Canal at Atherstone. From the Coventry Canal, the site of the project extends in a south-easterly direction connecting to the Oxford Canal followed by the Grand Union Canal. Water will then be abstracted and treated south of Milton Keynes before being transferred to an existing water supply reservoir near Luton.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Minor
Newbold Road, RugbyHighway improvement works · WARWICKSHIRE COUNTY COUNCIL · Multi-way signals
Nov 2026 to Nov 2026 600 m away
Minor
North Street, RugbyWorks for road purposes · WARWICKSHIRE COUNTY COUNCIL · Give and take
Nov 2026 to Nov 2026 750 m away
Minor
North Street, RugbyWorks for road purposes · WARWICKSHIRE COUNTY COUNCIL · Give and take
Oct 2026 to Nov 2026 750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Rail Freight Interchanges · The site lies 5 km to the north-east of Hinckley town centre, north-west of the M69 junction 2.
decided Mar 2025 19.8 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.