What's changing near CV13 6HT
Within 2 km, around Stoke Golding, Higham & Fenny Drayton in Hinckley and Bosworth. Building, planning, schools, transport, prices and crime.
70new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+4.8%like-for-like prices in Stoke Golding, Higham & Fenny Drayton, 2024 → 2025 (council +2.8%)
-21%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
9 new homes completedhouses · Mar 2026 – Oct 2026
Oct 2026
900 m away - New homes
15 new homes completed4 flats, 11 houses · Jun 2026 – Oct 2026
Oct 2026
900 m away - New homes
9 new homes completedhouses · May 2025 – Apr 2026
Apr 2026
400 m away - New homes
9 new homes completedhouses · Jun 2025 – Jan 2026
Jan 2026
400 m away - New homes
16 new homes completed6 flats, 10 houses · Oct 2024
Nov 2024
450 m away - New homes
6 new homes completedhouses · Oct 2024
Nov 2024
450 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 12 postcodes nearby had new homes completed in the last two years.
2homes extended 2021–2025, typically adding 60 m²
6since energy certificates began (2008)
1in CV13 6HT itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
135hours of spills in 2025 between them (typical neighbourhood: about 36)
39spill events counted
- Severn Trent Water
Stoke Golding Sewage Pumping Stninto Trib Of River Sence20 spills, 87 hours in 2025
1.2 km away - Severn Trent Water
Roseway Street Csointo Ashby De La Zouch Canal19 spills, 48 hours in 2025
800 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
29 planned, approved or being built and 9 running (33 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Morrison Supermarkets, Cloverfield - Solar PanelsApproved, not yet built · 440 kW
Nov 2022
2.4 km away - Solar farm
Triumph Motorcycles, Normandy Way - Solar PV ArrayApproved, not yet built · 1 MW
Nov 2023
3.3 km away - Solar farm
Kirkby RoadApproved, not yet built · 24 MW
Oct 2022
3.9 km away - Rooftop solar
Tesco Distribution Depot, Dodwells Road - Solar PanelsApproved, not yet built
Sept 2024
4.0 km away - Rooftop solar
Hinckley Leisure Centre, Argents Mead - Solar PanelsApproved, not yet built · 310 kW
Aug 2024
4.2 km away - Solar farm
E M E B Sports & Social Club, Nutts Lane - Solar ArrayApproved, not yet built · 300 kW
Nov 2023
4.3 km away - Rooftop solar
Heath Lane Academy, Heath Lane - Solar PanelsApproved, not yet built · 280 kW
Jun 2026
4.8 km away - Rooftop solar
Dpd International Gateway, Logix Road Phase 1 - Solar PanelsApproved, not yet built · 750 kW
Oct 2023
5.0 km away - Rooftop solar
DPD International Gateway, Logix Road - Phase 2, Solar PanelsApproved, not yet built · 500 kW
Apr 2024
5.2 km away - Solar farm
Elms Farm - Hinckley Solar Farm & Battery StorageApproved, not yet built · 50 MW
Nov 2022
5.3 km away
Road and street works within 1 km
1 permitted works running now or planned, 1 of them major.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Mar 2025
6.1 km away - Decideddecided Feb 2026
17.9 km away - Decideddecided May 2020
25.3 km away - Decideddecided Jun 2025
26.2 km away - Decideddecided Jul 2014
27.2 km away - Pre-application
Daventry International Rail Freight Terminal Phase 4 (DIRFT 4)Storage or Distribution of Goods · The site extends to approximately 255 hectares and lies wholly within the administrative area of West Northamptonshire, c. 7km east of Rugby and c.11.5km north of Daventry. The M1 runs immediately adjacent to the western boundary of the Site, and it is located c.1km to the north of Junction 18 of the M1. DIRFT III (the latest phase of development at DIRFT) is located immediately west of the site across the M1 motorway. The site is c.1.3km to the north of the village of Crick and c.800m to west of the village of Yelvertoft.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: The Stables (solar farm, 550 m); Basin Bridge Farm (solar farm, 1.7 km); Horiba Mira, Mira Drive - Solar Array (solar farm, 4.5 km); Judkins Landfill Site Phase 3 (landfill gas, 7.1 km); Judkins Landfill Scheme (landfill gas, 7.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.