Within 2 km, around Market Bosworth, Barlestone & Sheepy Magna in Hinckley and Bosworth. Building, planning, schools, transport, prices and crime.
61new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+1.9%like-for-like prices in Market Bosworth, Barlestone & Sheepy Magna, 2024 → 2025 (council +2.8%)
-2%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 6 postcodes nearby had new homes completed in the last two years.
8homes extended 2021–2025, typically adding 29 m²
17since energy certificates began (2008)
3in CV13 0LT itself
- Extendedcertificate 2021
- Extendedcertificate 2020
- Extendedcertificate 2015
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
327hours of spills in 2025 between them (typical neighbourhood: about 36)
39spill events counted
- Severn Trent Water
Market Bosworth Stwinto Carlton Brook35 spills, 315 hours in 2025
1.6 km away - Severn Trent Water
Bosworth Park Spsinto Tributary Of River Sence4 spills, 12 hours in 2025
1.5 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
19 planned, approved or being built and 12 running (50 MW between them). Those within 5 km are on the map above.
- Solar farm
Stoneshollow Solar FarmApproved, not yet built · 50 MW
Aug 2022
3.8 km away - Battery storage
Stoneshollow Solar FarmApproved, not yet built
Aug 2022
3.8 km away - Solar farm
Heath Road, Bagworth - Solar FarmPlanning application in · 22 MW
Jul 2025
5.7 km away - Rooftop solar
Snippery Farm, Heath Road - Solar panelsApproved, not yet built · 200 kW
Dec 2025
5.7 km away - Solar farm
Manor Park, Twycross - Solar Photovoltaic PanelsApproved, not yet built · 180 kW
Sept 2021
5.9 km away - Solar farm
Kirkby RoadApproved, not yet built · 24 MW
Oct 2022
6.2 km away - Rooftop solar
Heath Lane Academy, Heath Lane - Solar PanelsApproved, not yet built · 280 kW
Jun 2026
7.5 km away - Rooftop solar
Morrison Supermarkets, Cloverfield - Solar PanelsApproved, not yet built · 440 kW
Nov 2022
8.0 km away - Solar farm
Hinckley Road - Solar FarmApproved, not yet built · 40 MW
May 2023
8.6 km away - Solar farm
Triumph Motorcycles, Normandy Way - Solar PV ArrayApproved, not yet built · 1 MW
Nov 2023
9.0 km away - Wind farm
Park House Farm, Leicester Lane - Wind Turbines
Road and street works within 1 km
4 permitted works running now or planned, 3 of them major.
- Major, planned
Station Road, Market BosworthHighway improvement works · LEICESTERSHIRE COUNTY COUNCIL · Two-way signals
Nov 2026 to Nov 2026
150 m away - Major
Station Road, Market BosworthRemedial works · LEICESTERSHIRE COUNTY COUNCIL · Some carriageway incursion
Nov 2026 to Nov 2026
200 m away - Major
Station Road, Market BosworthUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Nov 2026 to Nov 2026
250 m away - Minor
Station Road, Market BosworthUtility repair and maintenance works · HYPEROPTIC LTD · Two-way signals
Nov 2026 to Nov 2026
950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Mar 2025
10.1 km away - Decideddecided Jun 2025
21.9 km away - RecommendationSept 2026
22.7 km away - Decideddecided Feb 2026
23.6 km away - Decideddecided Jan 2016
25.1 km away - RecommendationSept 2026
25.1 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Hall Farm Solar Farm (Newbold Verdon) (solar farm, 4.0 km); Crown Farm (solar farm, 5.0 km); The Stables (solar farm, 5.3 km); Halifax Farm (wind farm, 5.7 km); Lindridge Farm (solar farm, 6.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.