What's changing near CV13 0HZ
Within 2 km, around Market Bosworth, Barlestone & Sheepy Magna in Hinckley and Bosworth. Building, planning, schools, transport, prices and crime.
56new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+1.9%like-for-like prices in Market Bosworth, Barlestone & Sheepy Magna, 2024 → 2025 (council +2.8%)
-2%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
41 new homes completedhouses · Feb 2026 – Sep 2026
Sept 2026
1.6 km away - New homes
7 new homes completedhouses · Jan 2026
Feb 2026
500 m away - New homes
5 new homes completedhouses · Sep 2025
Sept 2025
1.8 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 4 postcodes nearby had new homes completed in the last two years.
13homes extended 2021–2025, typically adding 23 m²
15since energy certificates began (2008)
0in CV13 0HZ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
198hours of spills in 2025 between them (typical neighbourhood: about 36)
50spill events counted
- Severn Trent Water
Barlestone Stwinto Osbaston Brook35 spills, 173 hours in 2025
450 m away - Severn Trent Water
Brookside Csointo Tributary Of River Sence15 spills, 25 hours in 2025
500 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
21 planned, approved or being built and 15 running (63 MW between them). Those within 5 km are on the map above.
- Solar farm
Stoneshollow Solar FarmApproved, not yet built · 50 MW
Aug 2022
550 m away - Battery storage
Stoneshollow Solar FarmApproved, not yet built
Aug 2022
550 m away - Solar farm
Heath Road, Bagworth - Solar FarmPlanning application in · 22 MW
Jul 2025
2.9 km away - Rooftop solar
Snippery Farm, Heath Road - Solar panelsApproved, not yet built · 200 kW
Dec 2025
2.9 km away - Rooftop solar
Laura Ashley, Stanton Under Bardon - Solar panelsApproved, not yet built · 450 kW
Dec 2020
6.1 km away - Rooftop solar
Gateway House, Interlink Way West - Solar PanelsApproved, not yet built · 570 kW
Jun 2023
6.2 km away - Rooftop solar
Trans Continental Marketing Limited, Regs Way - Solar PanelsApproved, not yet built · 250 kW
Sept 2025
6.8 km away - Rooftop solar
West Lane, Bardon Hill - Solar PV SystemApproved, not yet built · 610 kW
Aug 2021
6.9 km away - Solar farm
Kirkby RoadApproved, not yet built · 24 MW
Oct 2022
7.2 km away - Rooftop solar
Bardon Quarry - Solar PanelsApproved, not yet built · 190 kW
Aug 2024
7.5 km away - Wind farm
Park House Farm, Leicester Lane - Wind Turbines
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Mar 2025
11.2 km away - RecommendationSept 2026
19.9 km away - Decideddecided Jan 2016
22.2 km away - RecommendationSept 2026
22.2 km away - Decideddecided Jun 2025
22.4 km away - Decideddecided Dec 2014
26.1 km away - Decided
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Crown Farm (solar farm, 2.1 km); Hall Farm Solar Farm (Newbold Verdon) (solar farm, 2.4 km); Halifax Farm (wind farm, 3.4 km); Desford Brick Works, Bagworth - Solar Panels (rooftop solar, 4.0 km); Lindridge Farm (solar farm, 4.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.