What's changing near CV12 8SL
Within 2 km, around Bedworth Town in Nuneaton and Bedworth. Building, planning, schools, transport, prices and crime.
319new homes completed within 2 km, last 2 years
207homes given permission on brownfield sites since 2021
+4.2%like-for-like prices in Bedworth Town, 2024 → 2025 (council +2.8%)
-2%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
28 new homes completed4 flats, 24 houses · Nov 2025 – Oct 2026
Oct 2026
2.0 km away - New homes
15 new homes completedhouses · Aug 2025 – Sep 2026
Sept 2026
1.7 km away - New homes
6 new homes completedhouses · Oct 2025 – Jul 2026
Jul 2026
1.9 km away - New homes
6 new homes completedhouses · Mar 2026 – Jul 2026
Jul 2026
1.9 km away - New homes
6 new homes completedhouses · Oct 2025 – Jun 2026
Jun 2026
1.7 km away - New homes
33 new homes completedhouses · Dec 2025 – May 2026
May 2026
1.9 km away - New homes
8 new homes completed4 flats, 4 houses · Mar 2026
Mar 2026
750 m away - New homes
34 new homes completedhouses · Jan 2025 – Oct 2025
Oct 2025
1.8 km away - New homes
12 new homes completedhouses · Nov 2024 – Sep 2025
Sept 2025
2.0 km away - New homes
10 new homes completedhouses · Jul 2025
Aug 2025
1.9 km away - New homes
10 new homes completedhouses · Jan 2025 – Jul 2025
Jul 2025
1.9 km away - New homes
6 new homes completedhouses · Nov 2024 – Jul 2025
Jul 2025
700 m away
6homes extended 2021–2025, typically adding 21 m²
16since energy certificates began (2008)
0in CV12 8SL itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
188hours of spills in 2025 between them (typical neighbourhood: about 36)
37spill events counted
- Severn Trent Water
Bedworth Marston Lane Stwinto Wem Brook13 spills, 132 hours in 2025
1.8 km away - Severn Trent Water
Bedworth Marston Lane Stwinto Wem Brook10 spills, 55 hours in 2025
1.8 km away - Severn Trent Water
Collycroft Combined Sewer Overflowinto Coventry Canal8 spills, 1 hours in 2025
1.6 km away - Severn Trent Water
Chapel Streetinto Wem Brook (River Anker)6 spills, 0 hours in 2025
1.8 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
50 planned, approved or being built and 6 running (70 MW between them). Those within 5 km are on the map above.
- Solar farm
Newgate Coolliery - Solar Farm & Battery StoragePlanning application in · 6 MW
May 2024
1.4 km away - Battery storage
Newgate Coolliery - Solar Farm & Battery StoragePlanning application in · 5 MW
May 2024
1.4 km away - Battery storage
Mcdonnell Drive, Exhall - Battery Energy Storage SystemApproved, not yet built · 30 MW
Oct 2025
2.0 km away - Solar farm
Hollyhurst Farm, Mile Tree Lane - Solar PanelsPlanning application in · 26 MW
Dec 2024
2.5 km away - Rooftop solar
Hamilton Way, Unit 12 - Solar ArrayApproved, not yet built · 700 kW
Apr 2023
2.6 km away - Solar farm
Vauls Farm, Astley Lane - Solar FarmApproved, not yet built · 16 MW
Jul 2023
3.0 km away - Rooftop solar
St Georges Way - Solar photovoltaicsApproved, not yet built · 610 kW
May 2022
3.0 km away - Battery storage
Coventry National Grid Substation, Hawkesbury Hall - Battery StoragePlanning application in · 98 MW
Jul 2025
3.0 km away - Solar farm
Tolldish Hall Farm, Parrotts Grove - Solar Photovoltaic PanelsBeing built · 25 MW
Apr 2024
3.1 km away - Rooftop solar
George eliot high school, Raveloe Drive - Solar PanelsApproved, not yet built · 290 kW
Dec 2025
3.6 km away
Road and street works within 1 km
11 permitted works running now or planned, 10 of them major.
- Major, planned
Gallagher Road, BedworthUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Jan 2027 to Jan 2027
100 m away - Major
Gallagher Road, BedworthUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Jan 2027 to Jan 2027
100 m away - Major, planned
Newtown Road, BedworthUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Jan 2027 to Jan 2027
300 m away - Major
Newtown Road, BedworthUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Jan 2027 to Jan 2027
300 m away - Major, planned
Park Road, BedworthUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Jan 2027 to Jan 2027
550 m away - Major
George Street Ringway, BedworthUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Nov 2026 to Nov 2026
600 m away - Major, planned
Rectory Drive, ExhallHighway improvement works · WARWICKSHIRE COUNTY COUNCIL · Road closure
Dec 2026 to Dec 2026
600 m away - Major, planned
Park Road, BedworthHighway improvement works · WARWICKSHIRE COUNTY COUNCIL · Road closure
Jan 2027 to Jan 2027
600 m away - Major
Mill Street, BedworthUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Nov 2026 to Nov 2026600 m away
Major infrastructure projects within 30 km
- Decideddecided Feb 2026
8.0 km away - Decideddecided Mar 2025
13.7 km away - Decideddecided May 2020
15.7 km away - Decideddecided Jul 2014
24.3 km away - Pre-application
Daventry International Rail Freight Terminal Phase 4 (DIRFT 4)Storage or Distribution of Goods · The site extends to approximately 255 hectares and lies wholly within the administrative area of West Northamptonshire, c. 7km east of Rugby and c.11.5km north of Daventry. The M1 runs immediately adjacent to the western boundary of the Site, and it is located c.1km to the north of Junction 18 of the M1. DIRFT III (the latest phase of development at DIRFT) is located immediately west of the site across the M1 motorway. The site is c.1.3km to the north of the village of Crick and c.800m to west of the village of Yelvertoft. application due November 2027
25.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
Running nearest: Coventry National Grid Substation (battery storage, 3.0 km); Judkins Landfill Scheme (landfill gas, 6.0 km); Judkins Landfill Site Phase 3 (landfill gas, 6.0 km); Land South of Pogmore Spinney (solar farm, 8.1 km); Horiba Mira, Mira Drive - Solar Array (solar farm, 8.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.