What's changing near CV12 0LG
Within 2 km, around Bedworth Heath in Nuneaton and Bedworth. Building, planning, schools, transport, prices and crime.
240new homes completed within 2 km, last 2 years
171homes given permission on brownfield sites since 2021
+6.3%like-for-like prices in Bedworth Heath, 2024 → 2025 (council +2.8%)
+28%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
28 new homes completed4 flats, 24 houses · Nov 2025 – Oct 2026
Oct 2026
700 m away - New homes
15 new homes completedhouses · Aug 2025 – Sep 2026
Sept 2026
400 m away - New homes
19 new homes completedhouses · Dec 2025 – Aug 2026
Aug 2026
500 m away - New homes
6 new homes completedhouses · Oct 2025 – Jun 2026
Jun 2026
300 m away - New homes
33 new homes completedhouses · Dec 2025 – May 2026
May 2026
750 m away - New homes
8 new homes completedhouses · Nov 2025
Dec 2025
550 m away - New homes
6 new homes completedhouses · Nov 2024 – Jul 2025
Jul 2025
1.5 km away - New homes
16 new homes completed1 flats, 15 houses · Nov 2024 – Jun 2025
Jun 2025
1.6 km away - New homes
12 new homes completedhouses · Mar 2025 – Jun 2025
Jun 2025
1.7 km away - New homes
21 new homes completedhouses · Mar 2025 – May 2025
May 2025
1.7 km away - New homes
37 new homes completed4 flats, 33 houses · Dec 2024 – Apr 2025
Apr 2025
1.7 km away - New homes
17 new homes completedhouses · Feb 2025
Feb 20251.7 km away
5homes extended 2021–2025, typically adding 24 m²
7since energy certificates began (2008)
2in CV12 0LG itself
- Extendedcertificate 2024
- Extendedcertificate 2021
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
48 planned, approved or being built and 6 running (70 MW between them). Those within 5 km are on the map above.
- Solar farm
Newgate Coolliery - Solar Farm & Battery StoragePlanning application in · 6 MW
May 2024
400 m away - Battery storage
Newgate Coolliery - Solar Farm & Battery StoragePlanning application in · 5 MW
May 2024
400 m away - Solar farm
Vauls Farm, Astley Lane - Solar FarmApproved, not yet built · 16 MW
Jul 2023
1.5 km away - Solar farm
Corley Smorral Lane - Photovoltaic Solar ArraysApproved, not yet built · 17 MW
Jul 2022
2.2 km away - Battery storage
Corley Smorral Lane - Battery StorageApproved, not yet built
Jul 2022
2.2 km away - Battery storage
Mcdonnell Drive, Exhall - Battery Energy Storage SystemApproved, not yet built · 30 MW
Oct 2025
2.3 km away - Rooftop solar
Central Boulevard, Prologis Park - Solar PanelsApproved, not yet built · 2 MW
Dec 2025
2.5 km away - Rooftop solar
Unit 12, Central Boulevard - Solar PanelsApproved, not yet built · 820 kW
Feb 2026
2.5 km away - Rooftop solar
Unit 13, Central Boulevard - Solar photovoltaicsApproved, not yet built · 190 kW
Nov 2023
2.5 km away - Rooftop solar
Hamilton Way, Unit 12 - Solar ArrayApproved, not yet built · 700 kW
Apr 2023
3.6 km away
Road and street works within 1 km
1 permitted works running now or planned, 1 of them major.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Feb 2026
8.7 km away - Decideddecided May 2020
13.9 km away - Decideddecided Mar 2025
15.4 km away - Decideddecided Jul 2014
25.8 km away - Pre-application
Daventry International Rail Freight Terminal Phase 4 (DIRFT 4)Storage or Distribution of Goods · The site extends to approximately 255 hectares and lies wholly within the administrative area of West Northamptonshire, c. 7km east of Rugby and c.11.5km north of Daventry. The M1 runs immediately adjacent to the western boundary of the Site, and it is located c.1km to the north of Junction 18 of the M1. DIRFT III (the latest phase of development at DIRFT) is located immediately west of the site across the M1 motorway. The site is c.1.3km to the north of the village of Crick and c.800m to west of the village of Yelvertoft. application due November 2027
26.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
Running nearest: Coventry National Grid Substation (battery storage, 4.0 km); Land South of Pogmore Spinney (solar farm, 6.5 km); Judkins Landfill Scheme (landfill gas, 6.5 km); Judkins Landfill Site Phase 3 (landfill gas, 6.5 km); Coventry (energy from waste, 9.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.