What's changing near CV11 5TY
Within 2 km, around Caldwell & Chilvers Coton in Nuneaton and Bedworth. Building, planning, schools, transport, prices and crime.
313new homes completed within 2 km, last 2 years
236homes given permission on brownfield sites since 2021
-3.0%like-for-like prices in Caldwell & Chilvers Coton, 2024 → 2025 (council +2.8%)
-8%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
42 new homes completedhouses · Feb 2025 – Oct 2026
planned Oct 2026
1.5 km away - New homes
34 new homes completedhouses · Sep 2025 – Oct 2026
Oct 2026
1.7 km away - New homes
50 new homes completed2 flats, 48 houses · Feb 2025 – Aug 2026
Aug 2026
2.0 km away - New homes
31 new homes completedhouses · Nov 2024 – Aug 2026
Aug 2026
2.0 km away - New homes
18 new homes completedhouses · Nov 2024 – Jun 2026
Jun 2026
1.9 km away - New homes
45 new homes completedhouses · Feb 2025 – Jun 2026
Jun 2026
1.6 km away - New homes
12 new homes completedhouses · May 2025 – Jun 2026
Jun 2026
1.9 km away - New homes
25 new homes completedhouses · May 2025 – May 2026
May 2026
1.9 km away - New homes
15 new homes completed4 flats, 11 houses · Jul 2025 – Aug 2025
Aug 2025
1.6 km away - Planning permission
Permission for 65 homesChurch Street & Justice Walk, Site 51A025 -Vicarage Street Nuneaton (Church Street Shops & Justice Walk Car Park ) (outline planning permission) Aug 2025
650 m away - New homes
8 new homes completedhouses · Apr 2025 – Jun 2025
Jun 20251.9 km away
4homes extended 2021–2025, typically adding 51 m²
26since energy certificates began (2008)
0in CV11 5TY itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
506hours of spills in 2025 between them (typical neighbourhood: about 36)
78spill events counted
- Severn Trent Water
St. Marys Road Pumping Stationinto River Anker19 spills, 182 hours in 2025
1.1 km away - Severn Trent Water
Weddington - Weddington Road Spsinto River Anker30 spills, 162 hours in 2025
1.6 km away - Severn Trent Water
Nuneaton - St Marys Road O/F 2 (Cso)into River Anker28 spills, 162 hours in 2025
1.0 km away - Severn Trent Water
St. Marys Road Pumping Stationinto River Anker1 spills, 0 hours in 2025
1.1 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
40 planned, approved or being built and 8 running (76 MW between them). Those within 5 km are on the map above.
- Rooftop solar
George eliot high school, Raveloe Drive - Solar PanelsApproved, not yet built · 290 kW
Dec 2025
1.4 km away - Battery storage
Weddington Road - Battery Energy StorageApproved, not yet built · 50 MW
Feb 2026
1.4 km away - Rooftop solar
St Georges Way - Solar photovoltaicsApproved, not yet built · 610 kW
May 2022
1.6 km away - Rooftop solar
North Warwickshire College, Hinckley Road - Solar PanelApproved, not yet built · 290 kW
Sept 2023
1.8 km away - Rooftop solar
Hamilton Way, Unit 12 - Solar ArrayApproved, not yet built · 700 kW
Apr 2023
2.0 km away - Rooftop solar
The Nuneaton Academy, Radnor Drive - Solar PanelsPlanning application in · 460 kW
Mar 2026
2.3 km away - Battery storage
Hydes Lane, Stretton Baskerville - Battery StorageApproved, not yet built
Jul 2024
4.2 km away - Rooftop solar
Tesco Distribution Depot, Dodwells Road - Solar PanelsApproved, not yet built
Sept 2024
4.3 km away - Solar farm
Elms Farm - Hinckley Solar Farm & Battery StorageApproved, not yet built · 50 MW
Nov 2022
4.7 km away - Battery storage
Elms Farm - Solar Farm & Battery StorageApproved, not yet built
Nov 2022
4.7 km away
Road and street works within 1 km
10 permitted works running now or planned, 4 of them major.
- Major
Vicarage Street, NuneatonHighway improvement works · WARWICKSHIRE COUNTY COUNCIL · Lane closure
May 2026 to Jan 2027
550 m away - Major, planned
Vicarage Street, NuneatonHighway improvement works · WARWICKSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Dec 2026
550 m away - Major
Vicarage Street, NuneatonHighway improvement works · WARWICKSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Dec 2026
550 m away - Major, planned
Park Avenue, NuneatonUtility repair and maintenance works · SEVERN TRENT WATER · Road closure
Jan 2027 to Jan 2027
800 m away - Standard
Newtown Road, NuneatonNew service connection · National Grid Electricity Distribution (East Midlands) · No carriageway incursion
Oct 2026 to Nov 2026
800 m away - Minor
Coton Road, NuneatonRemedial works · SEVERN TRENT WATER · Lane closure
Dec 2026 to Dec 2026
300 m away - Minor
Church Street, NuneatonHighway improvement works · WARWICKSHIRE COUNTY COUNCIL · Multi-way signals
Oct 2026 to Oct 2026
400 m away - Minor
Caldwell Road, NuneatonUtility repair and maintenance works · SEVERN TRENT WATER · Multi-way signals
Oct 2026 to Oct 2026
700 m away - Minor
Jubilee Way, NuneatonWorks for road purposes · WARWICKSHIRE COUNTY COUNCIL · Some carriageway incursion
Oct 2026 to Oct 2026
850 m away
Major infrastructure projects within 30 km
- Decideddecided Mar 2025
10.5 km away - Decideddecided Feb 2026
11.9 km away - Decideddecided May 2020
18.4 km away - Decideddecided Jul 2014
25.7 km away - Pre-application
Daventry International Rail Freight Terminal Phase 4 (DIRFT 4)Storage or Distribution of Goods · The site extends to approximately 255 hectares and lies wholly within the administrative area of West Northamptonshire, c. 7km east of Rugby and c.11.5km north of Daventry. The M1 runs immediately adjacent to the western boundary of the Site, and it is located c.1km to the north of Junction 18 of the M1. DIRFT III (the latest phase of development at DIRFT) is located immediately west of the site across the M1 motorway. The site is c.1.3km to the north of the village of Crick and c.800m to west of the village of Yelvertoft. application due November 2027
26.3 km away - Decided
Transport schemes within 20 km
New homes15 new homes completed8 flats, 7 houses · Nov 2024 – Jan 2025
Jan 2025
1.5 km away Planning permissionOct 2024
650 m away Planning permissionPermission for 14 homesLand north of 116-120 Abbey Street Site 51a036 - Burgage Walk Nunetaon (full planning permission) Aug 2024
700 m away Planning permissionJul 2024
550 m away Planning permissionFeb 2024
750 m away Planning permissionNov 2022
1.4 km away Planning permissionJun 2022
1.3 km away Planning permissionJan 2022
2.0 km away Planning permissionPermission for 1 homeSite 51A073 - Ex Co-op buildings and car park, Abbey Street, Nuneaton, CV11 5BU (outline planning permission) Jan 2022
650 m away New schoolJan 2021
650 m away School closedSchool closed: Independent Educational Services - CentralOther independent special school, other independent special school (closure)
Feb 2020
1.1 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 19 postcodes nearby had new homes completed in the last two years.
Solar farm
Triumph Motorcycles, Normandy Way - Solar PV ArrayApproved, not yet built · 1 MW
Nov 2023
4.9 km away
Solar farmE M E B Sports & Social Club, Nutts Lane - Solar ArrayApproved, not yet built · 300 kW
Nov 2023
5.1 km away Running nearest: Judkins Landfill Site Phase 3 (landfill gas, 1.9 km); Judkins Landfill Scheme (landfill gas, 1.9 km); Horiba Mira, Mira Drive - Solar Array (solar farm, 4.1 km); Basin Bridge Farm (solar farm, 5.8 km); Coventry National Grid Substation (battery storage, 7.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Minor
Meadow Street, NuneatonUtility asset works · National Grid Electricity Distribution (East Midlands) · Multi-way signals
Feb 2027 to Feb 2027
1000 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Generating Stations · Land at Rosliston Road, south of Drakelow Power Station
decided Jun 2025
28.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.