Within 2 km, around Nuneaton Town Centre in Nuneaton and Bedworth. Building, planning, schools, transport, prices and crime.
50new homes completed within 2 km, last 2 years
220homes given permission on brownfield sites since 2021
+7.9%like-for-like prices in Nuneaton Town Centre, 2024 → 2025 (council +2.8%)
+3%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New homes
6 new homes completedhouses · Jun 2026 – Sep 2026
Sept 2026 2.0 km away
Planning permission
Permission for 65 homesChurch Street & Justice Walk, Site 51A025 -Vicarage Street Nuneaton (Church Street Shops & Justice Walk Car Park ) (outline planning permission)
Aug 2025 1.0 km away
New homes
12 new homes completedhouses · Nov 2024 – Apr 2025
Apr 2025 1.8 km away
New homes
14 new homes completed4 flats, 10 houses · Dec 2024 – Apr 2025
Apr 2025 1.7 km away
New homes
7 new homes completedhouses · Nov 2024 – Apr 2025
Apr 2025 1.9 km away
Planning permission
Permission for 9 homesTiny Town 126 Abbey Street, Nuneaton, Warwickshire (full planning permission)
Oct 2024 800 m away
Planning permission
Permission for 14 homesLand north of 116-120 Abbey Street Site 51a036 - Burgage Walk Nunetaon (full planning permission)
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
630hours of spills in 2025 between them (typical neighbourhood: about 36)
104spill events counted
Severn Trent Water
St. Marys Road Pumping Stationinto River Anker19 spills, 182 hours in 2025
550 m away
Severn Trent Water
Weddington - Weddington Road Spsinto River Anker30 spills, 162 hours in 2025
700 m away
Severn Trent Water
Nuneaton - St Marys Road O/F 2 (Cso)into River Anker28 spills, 162 hours in 2025
600 m away
Severn Trent Water
Church Lane Combined Sewer Overflowinto River Anker26 spills, 124 hours in 2025
800 m away
Severn Trent Water
St. Marys Road Pumping Stationinto River Anker1 spills, 0 hours in 2025
Oaklands Farm Solar ParkGenerating Stations · Land at Rosliston Road, south of Drakelow Power Station
decided Jun 2025 27.3 km away
Pre-application
Daventry International Rail Freight Terminal Phase 4 (DIRFT 4)Storage or Distribution of Goods · The site extends to approximately 255 hectares and lies wholly within the administrative area of West Northamptonshire, c. 7km east of Rugby and c.11.5km north of Daventry. The M1 runs immediately adjacent to the western boundary of the Site, and it is located c.1km to the north of Junction 18 of the M1. DIRFT III (the latest phase of development at DIRFT) is located immediately west of the site across the M1 motorway. The site is c.1.3km to the north of the village of Crick and c.800m to west of the village of Yelvertoft.
Transport schemes within 20 km
Transport
HS2: Interchange station (Solihull)Under construction, near the NEC and Birmingham Airport
under construction 18.6 km away
The longer view
Like-for-like prices in Nuneaton Town Centre: +25% over five years (2020 → 2025).
Council tax list: 50 homes added in the neighbourhood since April 2024.
Population (GP registrations): -2.0% in two years.
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
application due November 2027 27.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.