Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Daventry International Rail Freight Terminal Phase 4 (DIRFT 4)Storage or Distribution of Goods · The site extends to approximately 255 hectares and lies wholly within the administrative area of West Northamptonshire, c. 7km east of Rugby and c.11.5km north of Daventry. The M1 runs immediately adjacent to the western boundary of the Site, and it is located c.1km to the north of Junction 18 of the M1. DIRFT III (the latest phase of development at DIRFT) is located immediately west of the site across the M1 motorway. The site is c.1.3km to the north of the village of Crick and c.800m to west of the village of Yelvertoft.
Transport schemes within 20 km
Transport
HS2: Interchange station (Solihull)Under construction, near the NEC and Birmingham Airport
under construction 16.2 km away
The longer view
Like-for-like prices in Stockingford: +26% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.0% in two years.
School closed: Independent Educational ServicesOther independent special school, other independent special school (closure)
Jul 2021 200 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
Newgate Coolliery - Solar Farm & Battery StoragePlanning application in · 5 MW
May 2024 4.4 km away
Solar farm
Corley Smorral Lane - Photovoltaic Solar ArraysApproved, not yet built · 17 MW
Jul 2022 5.4 km away
Running nearest: Judkins Landfill Scheme (landfill gas, 2.3 km); Judkins Landfill Site Phase 3 (landfill gas, 2.3 km); Horiba Mira, Mira Drive - Solar Array (solar farm, 5.2 km); Land South of Pogmore Spinney (solar farm, 6.7 km); Coventry National Grid Substation (battery storage, 7.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
application due November 2027 28.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.