What's changing near CV10 7RY
Within 2 km, around Tomkinson Road in Nuneaton and Bedworth. Building, planning, schools, transport, prices and crime.
49new homes completed within 2 km, last 2 years
263homes given permission on brownfield sites since 2021
+8.7%like-for-like prices in Tomkinson Road, 2024 → 2025 (council +2.8%)
+21%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool closedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
12 new homes completedhouses · Nov 2024 – Apr 2025
Apr 2025
1.1 km away - New homes
14 new homes completed4 flats, 10 houses · Dec 2024 – Apr 2025
Apr 2025
700 m away - New homes
7 new homes completedhouses · Nov 2024 – Apr 2025
Apr 2025
1.2 km away - Planning permissionOct 2024
2.0 km away - Planning permissionSept 2024
900 m away - School closed
School closed: Values AcademyOther independent special school, other independent special school (closure)
Aug 2024
500 m away - Planning permission
Permission for 14 homesLand north of 116-120 Abbey Street Site 51a036 - Burgage Walk Nunetaon (full planning permission) Aug 2024
1.9 km away - Planning permission
Permission for 6 homesSite 37a004 - Tudor Road Land off (R/o 8-54 access between 12 & 14 Tudor Rd), Tudor Road, Nuneaton (full planning permission) Feb 2023
1.8 km away - Planning permission
19homes extended 2021–2025, typically adding 24 m²
30since energy certificates began (2008)
2in CV10 7RY itself
- Extendedcertificate 2026
- Extendedcertificate 2024
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
37 planned, approved or being built and 10 running (81 MW between them). Those within 5 km are on the map above.
- Rooftop solar
The Nuneaton Academy, Radnor Drive - Solar PanelsPlanning application in · 460 kW
Mar 2026
450 m away - Rooftop solar
St Georges Way - Solar photovoltaicsApproved, not yet built · 610 kW
May 2022
2.2 km away - Rooftop solar
Hamilton Way, Unit 12 - Solar ArrayApproved, not yet built · 700 kW
Apr 2023
2.3 km away - Battery storage
Weddington Road - Battery Energy StorageApproved, not yet built · 50 MW
Feb 2026
2.6 km away - Rooftop solar
George eliot high school, Raveloe Drive - Solar PanelsApproved, not yet built · 290 kW
Dec 2025
2.9 km away - Rooftop solar
North Warwickshire College, Hinckley Road - Solar PanelApproved, not yet built · 290 kW
Sept 2023
3.5 km away - Solar farm
Vauls Farm, Astley Lane - Solar FarmApproved, not yet built · 16 MW
Jul 2023
4.1 km away - Solar farm
Newgate Coolliery - Solar Farm & Battery StoragePlanning application in · 6 MW
May 2024
4.6 km away - Battery storage
Newgate Coolliery - Solar Farm & Battery StoragePlanning application in · 5 MW
May 2024
4.6 km away - Solar farm
Park Lane, Astley - Solar PV FarmApproved, not yet built · 30 MW
Jul 2022
4.9 km away
Road and street works within 1 km
3 permitted works running now or planned, 2 of them major.
- Major, planned
Footpath From Silver Walk To Rear Of Silver Walk, NuneatonUtility asset works · BT · No carriageway incursion
Dec 2026 to Dec 2026
700 m away - Major, planned
Hilary Road, NuneatonHighway improvement works · WARWICKSHIRE COUNTY COUNCIL · Road closure
Dec 2026 to Dec 2026
1000 m away - Standard
Tryan Road, NuneatonDisconnection or alteration of supply · National Grid Electricity Distribution (East Midlands) · Some carriageway incursion
Oct 2026 to Oct 2026
550 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Feb 2026
12.5 km away - Decideddecided Mar 2025
12.5 km away - Decideddecided May 2020
16.6 km away - Decideddecided Jul 2014
27.4 km away - Decideddecided Jun 2025
27.8 km away - Pre-application
Daventry International Rail Freight Terminal Phase 4 (DIRFT 4)Storage or Distribution of Goods · The site extends to approximately 255 hectares and lies wholly within the administrative area of West Northamptonshire, c. 7km east of Rugby and c.11.5km north of Daventry. The M1 runs immediately adjacent to the western boundary of the Site, and it is located c.1km to the north of Junction 18 of the M1. DIRFT III (the latest phase of development at DIRFT) is located immediately west of the site across the M1 motorway. The site is c.1.3km to the north of the village of Crick and c.800m to west of the village of Yelvertoft.
Transport schemes within 20 km
Running nearest: Judkins Landfill Scheme (landfill gas, 1.8 km); Judkins Landfill Site Phase 3 (landfill gas, 1.8 km); Horiba Mira, Mira Drive - Solar Array (solar farm, 4.7 km); Basin Bridge Farm (solar farm, 7.1 km); Land South of Pogmore Spinney (solar farm, 7.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.