What's changing near CV10 0BJ
Within 2 km, around Weddington & St Nicholas Park in Nuneaton and Bedworth. Building, planning, schools, transport, prices and crime.
482new homes completed within 2 km, last 2 years
481homes given permission on brownfield sites since 2021
-0.2%like-for-like prices in Weddington & St Nicholas Park, 2024 → 2025 (council +2.8%)
+35%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
39 new homes completed5 flats, 34 houses · Jan 2026 – Sep 2026
Sept 2026
1.3 km away - New homes
16 new homes completed2 flats, 14 houses · Nov 2025 – Sep 2026
Sept 2026
1.3 km away - New homes
17 new homes completedhouses · Dec 2025 – Sep 2026
Sept 2026
1.4 km away - New homes
20 new homes completedhouses · Nov 2024 – Sep 2026
Sept 2026
1.4 km away - New homes
6 new homes completedhouses · Jun 2026 – Sep 2026
Sept 2026
1.3 km away - New homes
13 new homes completedhouses · May 2026 – Jul 2026
Jul 2026
1.5 km away - New homes
10 new homes completedhouses · Feb 2026 – Jul 2026
Jul 2026
1.5 km away - New homes
34 new homes completedhouses · Dec 2025 – Jun 2026
Jun 2026
1.5 km away - New homes
20 new homes completedhouses · Dec 2025 – Jun 2026
Jun 2026
1.4 km away - New homes
20 new homes completed4 flats, 16 houses · Oct 2024 – May 2026
May 2026
1.8 km away - New homes
13 new homes completedhouses · Mar 2025 – May 2026
May 2026
1.7 km away - New homes
47 new homes completedhouses · Oct 2024 – Apr 2026
Apr 20261.3 km away
17homes extended 2021–2025, typically adding 23 m²
19since energy certificates began (2008)
0in CV10 0BJ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
5storm overflows within 2 km
630hours of spills in 2025 between them (typical neighbourhood: about 36)
104spill events counted
- Severn Trent Water
St. Marys Road Pumping Stationinto River Anker19 spills, 182 hours in 2025
1000 m away - Severn Trent Water
Weddington - Weddington Road Spsinto River Anker30 spills, 162 hours in 2025
700 m away - Severn Trent Water
Nuneaton - St Marys Road O/F 2 (Cso)into River Anker28 spills, 162 hours in 2025
1.0 km away - Severn Trent Water
Church Lane Combined Sewer Overflowinto River Anker26 spills, 124 hours in 2025
1.1 km away - Severn Trent Water
St. Marys Road Pumping Stationinto River Anker1 spills, 0 hours in 2025
1000 m away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
38 planned, approved or being built and 9 running (76 MW between them). Those within 5 km are on the map above.
- Rooftop solar
North Warwickshire College, Hinckley Road - Solar PanelApproved, not yet built · 290 kW
Sept 2023
500 m away - Battery storage
Weddington Road - Battery Energy StorageApproved, not yet built · 50 MW
Feb 2026
600 m away - Rooftop solar
George eliot high school, Raveloe Drive - Solar PanelsApproved, not yet built · 290 kW
Dec 2025
2.9 km away - Rooftop solar
Tesco Distribution Depot, Dodwells Road - Solar PanelsApproved, not yet built
Sept 2024
3.0 km away - Rooftop solar
St Georges Way - Solar photovoltaicsApproved, not yet built · 610 kW
May 2022
3.4 km away - Solar farm
Triumph Motorcycles, Normandy Way - Solar PV ArrayApproved, not yet built · 1 MW
Nov 2023
3.4 km away - Battery storage
Hydes Lane, Stretton Baskerville - Battery StorageApproved, not yet built
Jul 2024
3.5 km away - Rooftop solar
The Nuneaton Academy, Radnor Drive - Solar PanelsPlanning application in · 460 kW
Mar 2026
3.6 km away - Rooftop solar
Hamilton Way, Unit 12 - Solar ArrayApproved, not yet built · 700 kW
Apr 2023
3.8 km away - Solar farm
E M E B Sports & Social Club, Nutts Lane - Solar ArrayApproved, not yet built · 300 kW
Nov 2023
4.0 km away
Road and street works within 1 km
6 permitted works running now or planned, 4 of them major.
- Major, planned
Kingsbridge Road, NuneatonHighway improvement works · WARWICKSHIRE COUNTY COUNCIL · Road closure
Dec 2026 to Dec 2026
450 m away - Major
The Coppice, NuneatonHighway improvement works · WARWICKSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026
700 m away - Major, planned
St Nicolas Park Drive, NuneatonHighway improvement works · WARWICKSHIRE COUNTY COUNCIL · Road closure
Jan 2027 to Jan 2027
800 m away - Major, planned
Pallett Drive, NuneatonHighway improvement works · WARWICKSHIRE COUNTY COUNCIL · Road closure
Jan 2027 to Jan 2027
950 m away - Minor
Hinckley Road, NuneatonHighway improvement works · WARWICKSHIRE COUNTY COUNCIL · Stop/go boards
Dec 2026 to Dec 2026
600 m away - Minor
Ullswater Avenue, NuneatonRemedial works · SEVERN TRENT WATER · Two-way signals
Oct 2026 to Oct 2026
850 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Mar 2025
9.4 km away - Decideddecided Feb 2026
13.4 km away - Decideddecided May 2020
19.8 km away - Decideddecided Jul 2014
26.3 km away - Pre-application
Daventry International Rail Freight Terminal Phase 4 (DIRFT 4)Storage or Distribution of Goods · The site extends to approximately 255 hectares and lies wholly within the administrative area of West Northamptonshire, c. 7km east of Rugby and c.11.5km north of Daventry. The M1 runs immediately adjacent to the western boundary of the Site, and it is located c.1km to the north of Junction 18 of the M1. DIRFT III (the latest phase of development at DIRFT) is located immediately west of the site across the M1 motorway. The site is c.1.3km to the north of the village of Crick and c.800m to west of the village of Yelvertoft. application due November 2027
26.8 km away - Decided
Transport schemes within 20 km
Running nearest: Judkins Landfill Site Phase 3 (landfill gas, 1.7 km); Judkins Landfill Scheme (landfill gas, 1.8 km); Horiba Mira, Mira Drive - Solar Array (solar farm, 2.4 km); Basin Bridge Farm (solar farm, 4.0 km); The Stables (solar farm, 5.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.