Country England and Wales › Region South East › Council Canterbury › Neighbourhood Herne Bay South & Greenhill › Postcode CT6 8PQ What's changing near CT6 8PQ Within 2 km, around Herne Bay South & Greenhill in Canterbury. Building, planning, schools, transport, prices and crime.
567 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-2.1% like-for-like prices in Herne Bay South & Greenhill, 2024 → 2025 (council 0.0%)
+6% recorded crime, last 12 months vs the 12 before
On the map
New homes School closed Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 36 new homes completed houses · Jul 2025 – Oct 2026
Oct 2026 1.5 km away New homes 11 new homes completed houses · Apr 2026 – Oct 2026
Oct 2026 1.6 km away New homes 62 new homes completed 36 flats, 26 houses · Aug 2025 – Sep 2026
Sept 2026 1.5 km away New homes 42 new homes completed 31 flats, 11 houses · May 2025 – Sep 2026
Sept 2026 1.3 km away New homes 20 new homes completed houses · Oct 2025 – Sep 2026
Sept 2026 1.8 km away New homes 15 new homes completed houses · Aug 2025 – Sep 2026
Sept 2026 1.7 km away School closed School closed: Fairlight Glen Independent Special School Other independent special school, other independent special school (closure)
Jul 2026 200 m away New homes 22 new homes completed houses · Feb 2025 – Jul 2026
Jul 2026 1.4 km away New homes 19 new homes completed houses · Feb 2026 – Jun 2026
Jun 2026 1.3 km away New homes 58 new homes completed 16 flats, 42 houses · Feb 2025 – May 2026
May 2026 1.8 km away New homes 14 new homes completed houses · Nov 2025 – Apr 2026
Apr 2026 1.3 km away New homes
17 homes extended 2021–2025, typically adding 28 m²
35 since energy certificates began (2008)
3 in CT6 8PQ itself
Extended certificate 2021 Extended certificate 2020 Extended certificate 2009 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
4 hours of spills in 2025 between them (typical neighbourhood: about 36)
4 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 12 planned, approved or being built and 6 running (87 MW between them). Those within 5 km are on the map above.
Hydrogen Ryse Hydrogen Limited, Thanet Way - Hydrogen Electrolysis Facility Approved, not yet built
Jul 2020 1.8 km away Battery storage Owls Hatch Road, Thanet Way - Battery Energy Storage Facility Approved, not yet built · 50 MW
Jul 2025 2.2 km away Battery storage Woodlands Farm, Calcott Hill - Battery Energy Storage Approved, not yet built · 228 MW
May 2026 3.9 km away Rooftop solar Swalecliffe Community Primary School, Bridgefield Road - Solar Panels Approved, not yet built · 200 kW
Aug 2023 4.2 km away Solar farm Britton Court Farm, Hackington Road - Solar Farm Approved, not yet built · 38 MW
Jul 2025 6.7 km away Battery storage Britton Court Farm, Hackington Road - Battery Energy Storage Approved, not yet built
Jul 2025 6.7 km away Battery storage Markerstudy Business Park, Wraik Hill - Micro Energy Storage Approved, not yet built · 200 kW
Nov 2025 7.5 km away Rooftop solar Amery Court Farm - Solar Array Planning application in
Oct 2021 7.7 km away Rooftop solar Parker Steel, Vauxhall Industrial Road - Solar Panels Approved, not yet built · 1 MW
Oct 2024 7.9 km away Rooftop solar University Of Kent, Templeman Library - Solar PV panels Approved, not yet built · 270 kW
Dec 2024 8.4 km away Road and street works within 1 km 8 permitted works running now or planned, 5 of them major.
Major, planned Eddington Lane, Herne Bay Highway improvement works · KENT COUNTY COUNCIL · Road closure
Jan 2027 to Jan 2027 650 m away Major Eddington Lane, Herne Bay Highway improvement works · KENT COUNTY COUNCIL · Road closure
Jan 2027 to Jan 2027 650 m away Major, planned Thanet Way, Herne Bay Highway improvement works · KENT COUNTY COUNCIL · Lane closure
Nov 2026 to Nov 2026 750 m away Major Thanet Way, Herne Bay Highway improvement works · KENT COUNTY COUNCIL · Lane closure
Nov 2026 to Nov 2026 750 m away Major Underdown Road, Herne Bay Utility repair and maintenance works · SOUTHERN WATER · Road closure
Oct 2026 to Nov 2026 800 m away Standard Pier Avenue, Herne Bay New service connection · UK POWER NETWORKS SOUTH EASTERN · No carriageway incursion
Oct 2026 to Oct 2026 300 m away Standard High Street, Herne Bay New service connection · SOUTHERN GAS NETWORKS PLC · Some carriageway incursion
Oct 2026 to Oct 2026 550 m away Minor High Street, Herne Bay New service connection · UK POWER NETWORKS SOUTH EASTERN · Some carriageway incursion
Oct 2026 to Oct 2026 750 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Feb 2013 6.0 km away Decided decided Aug 2017 10.5 km away Decided Cleve Hill Solar Park Generating Stations · Land approximately 2 km northeast of Faversham and 5 km west of Whitstable on the North Kent Coast. decided May 2020 13.9 km away Decided decided Aug 2022 16.3 km away Decided decided Feb 2021 25.0 km away Decided decided Jul 2019 25.2 km away Decided Transport schemes within 20 km Running nearest: Owls Hatch Road (solar farm, 2.2 km); Molehill Farm (solar farm, 2.6 km); Woodlands Farm Solar Park (solar farm, 4.6 km); Shelford Generation Plant II (landfill gas, 7.6 km); Shelford Landfill Scheme (landfill gas, 7.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.