Country England and Wales › Region South East › Council Canterbury › Neighbourhood Herne & Broomfield › Postcode CT6 7DU What's changing near CT6 7DU Within 2 km, around Herne & Broomfield in Canterbury. Building, planning, schools, transport, prices and crime.
419 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+1.2% like-for-like prices in Herne & Broomfield, 2024 → 2025 (council 0.0%)
+1% recorded crime, last 12 months vs the 12 before
On the map
New homes School closed Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 11 new homes completed houses · Apr 2026 – Oct 2026
Oct 2026 1.8 km away New homes 9 new homes completed houses · Apr 2026 – Sep 2026
Sept 2026 1.7 km away New homes 42 new homes completed 31 flats, 11 houses · May 2025 – Sep 2026
Sept 2026 1.0 km away New homes 6 new homes completed 1 flats, 5 houses · Jun 2026 – Aug 2026
Aug 2026 250 m away New homes 13 new homes completed houses · Apr 2026 – Aug 2026
Aug 2026 1.7 km away School closed School closed: Fairlight Glen Independent Special School Other independent special school, other independent special school (closure)
Jul 2026 2.0 km away New homes 22 new homes completed houses · Feb 2025 – Jul 2026
Jul 2026 1.0 km away New homes 11 new homes completed houses · Oct 2024 – Jun 2026
Jun 2026 2.0 km away New homes 19 new homes completed houses · Feb 2026 – Jun 2026
Jun 2026 1.2 km away New homes 14 new homes completed houses · Nov 2025 – Apr 2026
Apr 2026 1.3 km away New homes 7 new homes completed houses · Apr 2026
Apr 2026 1.8 km away New homes 8 new homes completed
24 homes extended 2021–2025, typically adding 32 m²
38 since energy certificates began (2008)
1 in CT6 7DU itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
4 hours of spills in 2025 between them (typical neighbourhood: about 36)
4 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 13 planned, approved or being built and 7 running (104 MW between them). Those within 5 km are on the map above.
Battery storage Woodlands Farm, Calcott Hill - Battery Energy Storage Approved, not yet built · 228 MW
May 2026 3.0 km away Battery storage Owls Hatch Road, Thanet Way - Battery Energy Storage Facility Approved, not yet built · 50 MW
Jul 2025 3.4 km away Hydrogen Ryse Hydrogen Limited, Thanet Way - Hydrogen Electrolysis Facility Approved, not yet built
Jul 2020 3.5 km away Rooftop solar Swalecliffe Community Primary School, Bridgefield Road - Solar Panels Approved, not yet built · 200 kW
Aug 2023 5.9 km away Solar farm Britton Court Farm, Hackington Road - Solar Farm Approved, not yet built · 38 MW
Jul 2025 6.9 km away Battery storage Britton Court Farm, Hackington Road - Battery Energy Storage Approved, not yet built
Jul 2025 6.9 km away Rooftop solar St Nicholas Court Farm, Court Road - Solar Panels Approved, not yet built · 150 kW
Jul 2025 7.0 km away Rooftop solar Parker Steel, Vauxhall Industrial Road - Solar Panels Approved, not yet built · 1 MW
Oct 2024 7.3 km away Rooftop solar Amery Court Farm - Solar Array Planning application in
Oct 2021 8.3 km away Rooftop solar University Of Kent, Templeman Library - Solar PV panels Approved, not yet built · 270 kW
Dec 2024 8.4 km away Road and street works within 1 km 4 permitted works running now or planned, 4 of them major.
Major Mill Lane, Herne Utility asset works · BT · Road closure
Oct 2026 to Oct 2026 300 m away Major Mill Lane, Herne Utility asset works · HARLAXTON ENERGY NETWORKS LIMITED · Road closure
Oct 2026 to Oct 2026 500 m away Major Thanet Way, Herne And Broomfield Utility asset works · HARLAXTON ENERGY NETWORKS LIMITED · Lane closure
Oct 2026 to Oct 2026 500 m away Major The Boulevard, Herne Bay Highway improvement works · KENT COUNTY COUNCIL · Multi-way signals
Jul 2026 to Oct 2026 750 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Feb 2013 7.6 km away Decided decided Aug 2017 8.5 km away Decided decided Aug 2022 14.5 km away Decided Cleve Hill Solar Park Generating Stations · Land approximately 2 km northeast of Faversham and 5 km west of Whitstable on the North Kent Coast. decided May 2020 15.4 km away Decided decided Feb 2021 26.7 km away Decided decided Jul 2019 26.9 km away Decided Transport schemes within 20 km Running nearest: Owls Hatch Road (solar farm, 3.2 km); Woodlands Farm Solar Park (solar farm, 3.8 km); Molehill Farm (solar farm, 4.0 km); St Nicholas Court Farm (AD) (anaerobic digestion, 7.0 km); Shelford Generation Plant II (landfill gas, 7.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.