Country England and Wales › Region South East › Council Canterbury › Neighbourhood Beltinge & Bishopstone › Postcode CT6 6HQ What's changing near CT6 6HQ Within 2 km, around Beltinge & Bishopstone in Canterbury. Building, planning, schools, transport, prices and crime.
186 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+1.8% like-for-like prices in Beltinge & Bishopstone, 2024 → 2025 (council 0.0%)
+4% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 14 new homes completed houses · Apr 2026 – Oct 2026
planned Oct 2026 200 m away New homes 16 new homes completed houses · Apr 2026 – Oct 2026
planned Oct 2026 350 m away New homes 6 new homes completed 1 flats, 5 houses · Jun 2026 – Aug 2026
Aug 2026 1.6 km away New homes 9 new homes completed houses · Nov 2024 – Jun 2026
Jun 2026 350 m away New homes 6 new homes completed houses · Feb 2026
Mar 2026 250 m away New homes 13 new homes completed houses · Nov 2025 – Jan 2026
Jan 2026 1.5 km away New homes 5 new homes completed houses · Nov 2025
Nov 2025 1.5 km away New homes 21 new homes completed houses · Apr 2025 – Nov 2025
Nov 2025 250 m away New homes 16 new homes completed houses · Jul 2025 – Oct 2025
Oct 2025 200 m away New homes 41 new homes completed houses · Nov 2024 – Jul 2025
Jul 2025 250 m away New homes 20 new homes completed houses · Feb 2025
Mar 2025 300 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 19 postcodes nearby had new homes completed in the last two years.
12 homes extended 2021–2025, typically adding 21 m²
24 since energy certificates began (2008)
1 in CT6 6HQ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 3 storm overflows within 2 km
169 hours of spills in 2025 between them (typical neighbourhood: about 36)
28 spill events counted
Southern Water Herne Bay Wwtw into Hogwell Sewer & R.Great Stour · near bathing water: Herne Bay 11 spills, 111 hours in 2025
750 m away Southern Water Gainsborough Drive Wwps, Herne Bay into North Sea Via A Ditch · near bathing water: Herne Bay; Herne Bay Central 9 spills, 32 hours in 2025
600 m away Southern Water Kings Hall Wps, Herne Bay into North Sea · near bathing water: Herne Bay; Herne Bay Central 8 spills, 26 hours in 2025
2.0 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 9 planned, approved or being built and 6 running (87 MW between them). Those within 5 km are on the map above.
Battery storage Woodlands Farm, Calcott Hill - Battery Energy Storage Approved, not yet built · 228 MW
May 2026 4.7 km away Hydrogen Ryse Hydrogen Limited, Thanet Way - Hydrogen Electrolysis Facility Approved, not yet built
Jul 2020 4.9 km away Battery storage Owls Hatch Road, Thanet Way - Battery Energy Storage Facility Approved, not yet built · 50 MW
Jul 2025 5.1 km away Rooftop solar St Nicholas Court Farm, Court Road - Solar Panels Approved, not yet built · 150 kW
Jul 2025 5.6 km away Rooftop solar Swalecliffe Community Primary School, Bridgefield Road - Solar Panels Approved, not yet built · 200 kW
Aug 2023 7.4 km away Rooftop solar hanet Earth, Barrow Man Road - Solar Panel Array Approved, not yet built · 1 MW
Oct 2022 8.5 km away Solar farm Britton Court Farm, Hackington Road - Solar Farm Approved, not yet built · 38 MW
Jul 2025 8.8 km away Battery storage Britton Court Farm, Hackington Road - Battery Energy Storage Approved, not yet built
Jul 2025 8.8 km away Rooftop solar Parker Steel, Vauxhall Industrial Road - Solar Panels Approved, not yet built · 1 MW
Oct 2024 9.0 km away Running nearest: Owls Hatch Road (solar farm, 5.0 km); Woodlands Farm Solar Park (solar farm, 5.5 km); St Nicholas Court Farm (AD) (anaerobic digestion, 5.6 km); Molehill Farm (solar farm, 5.7 km); Shelford Generation Plant II (landfill gas, 8.8 km).
Road and street works within 1 km 4 permitted works running now or planned, 2 of them major.
Major, planned Burlington Drive, Herne Bay Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Sept 2026 to Jul 2027 1000 m away Major Burlington Drive, Herne Bay Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Sept 2026 to Jul 2027 1000 m away Standard Bishopstone Lane, Herne Bay New service connection · UK POWER NETWORKS SOUTH EASTERN · Some carriageway incursion
Oct 2026 to Oct 2026 950 m away Minor Gainsborough Drive, Herne Bay Utility repair and maintenance works · BT · Give and take
Oct 2026 to Oct 2026 450 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Feb 2013 7.5 km away Decided decided Aug 2017 8.2 km away Decided decided Aug 2022 13.2 km away Decided Cleve Hill Solar Park Generating Stations · Land approximately 2 km northeast of Faversham and 5 km west of Whitstable on the North Kent Coast. decided May 2020 17.0 km away Decided decided Jun 2020 27.3 km away Decided decided Feb 2021 28.2 km away Decided Transport schemes within 20 km DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.